Leadwork, Old and Ornamental and for the most part EnglishLethaby, W. R. (William Richard)
History
Leadwork, Old and Ornamental and for the most part English
Lethaby, W. R. (William Richard)
Leadwork
The Romans used lead as a roof covering. In the West “one can hardly
(Viollet-le-Duc says) explore the ruins of a Gallo-Roman erection
without finding some sheet-lead that had been employed for gutters or
roofs.” In the East--Eusebius says of Constantine’s Basilica (the Holy
Sepulchre) at Jerusalem--“the roof with its chambers was covered with
lead to protect it from the winter rain.” In England Bede tells us of
Wilfrid having roofed his church at York with lead in the seventh
century, and it has continued without a break in its use as the most
perfect of coverings.
The methods employed in the middle ages are described by Burges and
Viollet-le-Duc. The latter well remarks that of lead covering, as well
as many other parts of the construction of buildings, we are a little
too apt to think overmuch of the perfection of our modern methods while
we are too little careful to learn the experience acquired by our
forefathers.
The old cast lead is much thicker than the modern milled lead, being as
much as twelve or thirteen pounds to the foot of surface. It is
certainly not quite even in thickness, and is subject to faults in the
casting, but it is not so liable to crack as is milled lead. The old
lead employed has also a considerable quantity of silver and arsenic in
it, which was the cause of the beautiful white oxide it obtained. Modern
lead blackens as the preparation of lead now includes its
“de-silverisation.” The acid of timber which has not lost its sap
decomposes lead; old building timber was water-seasoned as only ship
timber now is.
The chief difficulties that had to be overcome in the use of lead were
the weight of the sheets of lead to be maintained in position, and the
great dilatation of the metal under the heat of the sun, so that it had
to be at once strongly attached and free to move. The method followed
was to nail it at the top and roll the lateral edges together.
The roofing at Canterbury was of twelve-pound lead and about 2.0 between
the rolls. The thirteenth century lead of Chartres Cathedral, “covered
externally by time with a patina hard, brown, and wrinkled, and shining
in the sun,” was in sheets eight feet long, attached at the top by nails
with very large heads and held at the bottom by clips of iron that
passed down between the sheets and turned over the bottom edge of the
upper one. The rolls were formed by turning over the margins one in the
other without a wood roll; they were much smaller than the modern ones.
Our milled lead is rolled out in sheets about 16 × 6 feet and is usually
cut in half lengthways, and 4½ inches is allowed in each edge to form
the rolls which are thus 2′-3″ apart. Lead one inch thick is sixty
pounds to the square foot, so six-pounds lead is 1/10th of an inch in
thickness. We generally make the mistake of putting a longitudinal roll
along the ridge, but it is not so done in our old roofs, nor should it
be, for the running out of the rolls frets the ridge into a simple
decoration.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account