Letters and Literary Memorials of Samuel J. Tilden, v. 2Tilden, Samuel J. (Samuel Jones)
History
Letters and Literary Memorials of Samuel J. Tilden, v. 2
Tilden, Samuel J. (Samuel Jones)
Tilden, Samuel J. (Samuel Jones), 1814-1886
"We have found all the other more important provisions of these
contracts as uniformly disregarded. We have torn down and carefully
examined the work under more than forty contracts; and we cannot
name one in which the work comes up, even approximately, to the
specifications. The contracts define with great precision the
size and character of the stone to be used, the mode of their
disposition, the thickness and other dimensions of the wall, the
character of the cement and sand, the quality of lining, and what
else is needed to insure durability and a capacity to resist the
shocks from loaded boats to which the walls of canals are constantly
subjected. In no one of the forty-odd contracts that we examined
did we find the stone either in size or disposition; the dimensions
of the wall; the quality of the sand, lime, cement, and gravel, to
correspond with the specifications. The consequences to the State
are not only that it has been called upon to pay for a higher
class of work than it has received, but that it is exposed to a
large annual expenditure to keep these ill-constructed and for the
most part worthless walls in repair. It has been a not uncommon
circumstance for the superintendent to be called upon to repair the
earlier work under a vertical wall contract while other portions of
the structure were still in progress. To keep this class of walls in
repair promises to be one of the principal sources of expense for
the future maintenance of our canals.[5]
[5] See statement of Professors Michie and Wheeler, of the United
States Military Academy at West Point, on page 12 of first report of
this commission to the Governor.
"Nor is this system of fictitious estimates confined to vertical
wall. Since 1868 fifty-three and two-thirds miles of slope wall
have been built. By the terms of the contracts these walls should
have had an average thickness of at least fifteen inches, measured
perpendicularly to the slope. None of the stone composing it should
have been less than twelve inches in length at right angles to the
face, and the rear of the wall was to rest on a base of clean, hard
gravel nine inches thick. The engineers have uniformly estimated
these walls at the specified thickness of fifteen inches, while
in point of fact we have not found on any of our canals a single
stretch of slope wall, constructed since 1868, that would average
over ten inches. Of course, the stones are usually smaller than the
minimum size required by the specifications, and we did not find a
single specimen of the clean, hard gravel lining required by the
contract; so that the State has been made to pay, throughout the
whole forty-three and two-thirds miles of slope wall, for one-third
more of constructed wall than it has received--full prices for a
very inferior quality of stone--and for lining the whole work,
though not a single yard of the required quality appears to have
been ever furnished.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account