The low first cost, and non-liability to derangement, were always
kept in view; and his confirmed experience in the satisfactory
working of horizontal cylinders prior to 1812 illustrates their
extended application; for at that time scarcely any other engineer had
constructed other than upright cylinder engines. No detail escaped his
observant gaze. The fire-bars were to be 2 inches deep, 1 inch thick at
the top edge, tapered to 3/4ths of an inch at the bottom, giving the
required strength, with free room for air, which in its passage cooled
the bar, carrying the heat into the fire. Years before and after that
period the fire-bar in common use by thoughtless people was a square
iron bar that was always burning and bending.
The letter is descriptive of the high-pressure steam-engine in the
sixteenth year of its age; and its expansive steam, made practical
by Trevithick's high-pressure boilers. This engine only took steam
during the first quarter of its stroke, the remaining three-quarters
were by the expansion. Had it taken steam only during one-twentieth of
its stroke, it would have been more powerful than Boulton and Watt's
low-pressure steam vacuum engine of the same size.
[Rough draft.]
"SIR,
"CAMBORNE, _November 8th, 1812_.
"I have your favour of the 3rd inst., informing me that Messrs. Fox
and Williams have engaged to quarry the stone for e breakwater at
Plymouth, but does not say whether you hold any share with them in
the contract or not. Therefore I cannot understand from your letter
whether you wish to see an engine fitted to the purpose of the
breakwater, or for pumping the water from the foundations of the
Exeter Bridge. Please to inform me which of the two purposes you wish
to see the engine calculated for, and about what time you think you
shall want it, and I will get one finished suitable to the purpose you
intend it for.
"Yours, &c.,
"R. T.
"JAS. GREEN, ESQ., _St. David's Hill, Exeter_.
"N.B.--To what extent have Messrs. Fox engaged, and what parts of the
work do they perform? I think more good might be done by loading,
carrying, and discharging, than by quarrying only."
Trevithick was equally ready with the application of steam-power either
for pumping of water or for boring and removing rock. The use of
chisels and rock-breakers in the Thames in 1803[4] had prepared the way
for the more perfect engine for boring, lifting, and carrying rock from
the quarries to its destination at the Plymouth Breakwater in 1812.[5]
[Footnote 4: See Stonebreaker of 1803, vol. i., p. 239.]
[Footnote 5: See Steam-crane, vol. i., pp. 162, 274.]
"SIR,
"106, HOLBORN HILL, _November 26th, 1812_.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account