This firm, after careful deliberation, allowed that the work could
be accomplished, but in one way only. This was to construct a huge
caisson--practically a gigantic barrel of steel--on shore, to launch
and tow it to the site, and there to lower it until it rested on the
bottom. Then, by a removal of the sand from beneath this caisson, it
could be sunk to a great depth, and, the interior being filled with
concrete, a huge artificial core of rock would be created, capable of
supporting a tower. This system is employed extensively in connection
with bridge-building operations, and the firm entertained no doubts
concerning its feasibility at Rothersand. The society accordingly
prepared its designs, and advanced an estimate for the cost of the work.
At this juncture an unexpected competitor appeared on the scene. One of
the engineers engaged in the preparation of the Harkort designs severed
his connection with that firm, and, securing the collaboration of two
engineering colleagues, established a rival concern, which tendered for
the contract. They would follow the same lines, but would complete it
for £22,750, or $113,750, instead of £24,025, or $120,125, asked by the
Duisburg firm. The lower price was accepted, the more readily since it
included the foundations, whereas the Society Harkort set these down as
an extra. Naturally, the society was somewhat chagrined at this turn of
events, after all the trouble and care it had taken to discover the
most satisfactory solution of the problem, but subsequently it had good
reason not to regret its loss.
The new engineers set to work and during the winter of 1880-81
constructed a huge caisson, which was launched and on May 22 of the
latter year started down the Weser in charge of tugs. Then came a whole
string of accidents. One night the unwieldy fabric got adrift and
drove its nose into a sandbank, where it settled down with the tide.
The towing cables were attached once more, and after a great struggle
the structure was extricated on the next high-tide, and resumed its
journey. Reaching the site without further incident, it was lowered by
admitting the water within the barrel. But this task being accomplished
somewhat crudely, the water rushed in with such force that the caisson
commenced to spin round like a top, as well as bobbing up and down
like an angler’s float. It threatened to topple over and founder every
moment, but, luckily keeping upright, finally touched bottom. Lowering
was completed. Night having approached, workmen made themselves
comfortable on the caisson, while the constructional steamer stood off
and cast its anchor.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account