On gaining the rock, Lieutenant Alexander decided to make use of
the holes which had been driven into the granitic mass by Captain
Swift to receive the piles of the previous structure. The twisted
and broken pieces of iron were withdrawn and the holes cleaned out.
Simultaneously the upper surface of the rock was pared and trimmed by
the aid of chisels, which was no easy task, because at times the masons
were compelled to manipulate their tools as best they could in two
or three feet of water. This preparation of the rock to receive the
base constituted one of the most notable features of the work. In the
greater number of other outstanding achievements upon sea-rocks the
surface of the latter has been above the waves at lowest spring-tides,
whereas in this case a great part of the foundation work was
continuously submerged.
This preparation of the rock-face necessitated the final trimming and
shaping upon the site of many of the masonry blocks forming the root of
the tower. They could not possibly be prepared ashore to bring about
the tight fit which was imperative. Accordingly, all but the bottom
faces of the blocks were prepared in the depot on the mainland, and
they were then shipped to the ledge for final paring and trimming.
The attachment of the bottom courses to the rock-face was carried
out very ingeniously. Bags of sand were brought on to the rock and
laid around the spot upon which a particular block of stone was to be
laid. The sacks, being filled with sand, were pliable, so that, when
deposited, they adapted themselves to the contour of the ledge, and
prevented the water making its way in under the rampart. The water
within this small dam was then removed, sponges being used in the
final emptying task, so as to suck out the salt sea from the cracks
and crevices, leaving the surface on which the block of stone was to
be laid quite dry. A film of cement was then trowelled upon the rock
surface, and upon this was laid a sheet of muslin. The inclusion of the
muslin was a wise precaution, because while the work was in progress
a wandering wave was liable to curl over the rock, swamping the small
dried space, when, but for the presence of the muslin, the cement
would have been carried away. At the same time the cement was able to
penetrate the meshes of the muslin when the stone was deposited, so as
to grip the surface of the latter and to hold it tightly in position.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account