The Tunnels on the line are eight in number, their total length being
7336 yards. The first high ground encountered was Primrose Hill, where
the stiff London clay was passed through for a distance of about 1164
yards. The clay was close, compact, and dry, more difficult to work than
stone itself. It was entirely free from water; but the absorbing
properties of the clay were such that when exposed to the air it swelled
out rapidly. Hence an unusual thickness of brick lining was found
necessary; and the engineer afterwards informed the author that for some
time he entertained an apprehension lest the pressure should force in the
brickwork altogether. It was so great that it made the face of the
bricks to fly off in minute chips which covered his clothes whilst he was
inspecting the work. The materials used in the building were, however,
of excellent quality; and the tunnel was happily brought to a completion
without any accident.
At Watford the chalk ridge was penetrated by a tunnel about 1800 yards
long; and at Northchurch, Lindslade, and Stowe Hill, there were other
tunnels of minor extent. But the chief difficulty of the undertaking was
the execution of that under the Kilsby ridge. Though not the largest,
this is in many respects one of the most interesting works of the kind in
England. It is about 2400 yards long, and runs at an average depth of
about 160 feet below the surface. The ridge under which it extends is of
considerable extent, the famous battle of Naseby having been fought upon
one of the spurs of the same high ground about seven miles to the
eastward.
Previous to the letting of the contract, the character of the underground
soil was examined by trial-shafts. The tests indicated that it consisted
of shale of the lower oolite, and the works were let accordingly. But
they had scarcely been commenced when it was discovered that, at an
interval between the two trial-shafts which had been sunk, about 200
yards from the south end of the tunnel, there existed an extensive
quicksand under a bed of clay 40 feet thick, which the borings had
escaped in the most singular manner. At the bottom of one of these
shafts the excavation and building of the tunnel were proceeding, when
the roof at one part suddenly gave way, a deluge of water burst in, and
the party of workmen with the utmost difficulty escaped with their lives.
They were only saved by means of a raft, on which they were towed by one
of the engineers swimming with the rope in his mouth to the lower end of
the shaft, out of which they were safely lifted to the daylight. The
works were of course at that point immediately stopped.
[Picture: The Shafts over Kilsby Tunnel]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account