Another bridge, of still greater importance, necessary to complete the
continuity of the East Coast route, was the masterwork erected by Robert
Stephenson between the north and south banks of the Tyne at Newcastle,
commonly known as the High Level Bridge. Mr. R. W. Brandling, George
Stephenson’s early friend, is entitled to the merit of originating the
idea of this bridge as it was eventually carried out, with a central
terminus for the northern railways in the Castle Garth. The plan was
first promulgated by him in 1841; and in the following year it was
resolved that George Stephenson should be consulted as to the most
advisable site for the proposed structure. A prospectus of a High Level
Bridge Company was issued in 1843, the names of George Stephenson and
George Hudson appearing on the committee of management, Robert Stephenson
being the consulting engineer. The project was eventually taken up by
the Newcastle and Darlington Railway Company, and an Act for the
construction of the bridge was obtained in 1845.
The rapid extension of railways had given an extraordinary stimulus to
the art of bridge-building; the number of such structures erected in
Great Britain alone, since 1830, having been above 25,000, or more than
all that had before existed in the country. Instead of the erection a
single large bridge constituting, as formerly, an epoch in engineering,
hundreds of extensive bridges of novel design were simultaneously
constructed. The necessity which existed for carrying rigid roads,
capable of bearing heavy railway trains at high speeds, over extensive
gaps free of support, rendered it obvious that the methods which had up
to that time been employed for bridging space were altogether
insufficient. The railway engineer could not, like the ordinary road
engineer, divert his road and make choice of the best point for crossing
a river or a valley. He must take such ground as lay in the line of his
railway, be it bog, or mud, or shifting sand. Navigable rivers and
crowded thoroughfares had to be crossed without interruption to the
existing traffic, sometimes by bridges at right angles to the river or
road, sometimes by arches more or less oblique. In many cases great
difficulty arose from the limited nature of the headway; but, as the
level of the original road must generally be preserved, and that of the
railway was in a measure fixed and determined, it was necessary to modify
the form and structure of the bridge, in almost every case, in order to
comply with the public requirements. Novel conditions were met by fresh
inventions, and difficulties of the most unusual character were one after
another successfully surmounted. In executing these extraordinary works,
iron has been throughout the sheet-anchor of the engineer. In its
different forms of cast or wrought iron, it offered a valuable resource,
where rapidity of execution, great strength, and cheapness of
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account