construction in the first instance, were elements of prime importance;
and by its skilful use, the railway architect was enabled to achieve
results which thirty years ago would scarcely have been thought possible.
In many of the early cast-iron bridges the old form of the arch was
adopted, the stability of the structure depending wholly on compression,
the only novel feature being the use of iron instead of stone. But in a
large proportion of cases, the arch, with the railroad over it, was found
inapplicable in consequence of the limited headway which it provided.
Hence it early occurred to George Stephenson, when constructing the
Liverpool and Manchester Railway, to adopt the simple cast-iron beam for
the crossing of several roads and canals along that line—this beam
resembling in some measure the lintel of the early temples—the pressure
on the abutments being purely vertical. One of the earliest instances of
this kind of bridge was that erected over Water Street, Manchester, in
1829; after which, cast-iron girders, with their lower webs considerably
larger than their upper, were ordinarily employed where the span was
moderate; and wrought-iron tie rods below were added to give increased
strength where the span was greater.
The next step was the contrivance of arched beams or bowstring girders,
firmly held together by horizontal ties to resist the thrust, instead of
abutments. Numerous excellent specimens of this description of bridge
were erected by Robert Stephenson on the original London and Birmingham
Railway; but by far the grandest work of the kind—perfect as a specimen
of modern constructive skill—was the High Level Bridge, which we owe to
the genius of the same engineer.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account