London and Its Environs Described, vol. 4 (of 6): Containing an Account of Whatever is Most Remarkable for Grandeur, Elegance, Curiosity or Use, in the City and in the Country Twenty Miles Round ItAnonymous
History
London and Its Environs Described, vol. 4 (of 6): Containing an Account of Whatever is Most Remarkable for Grandeur, Elegance, Curiosity or Use, in the City and in the Country Twenty Miles Round It
Anonymous
London (England) -- Description and travel -- Early works to 1800; London (England) -- Gazetteers -- Early works to 1800
In this condition the bridge continued for several years; the confusions
in the state interrupting the government of the city, and putting a stop
to all farther improvements. However, some of the houses next the city
were rebuilt of timber in the years 1645 and 1646; these edifices were
three stories high; they had flat roofs adorned with balustrades, and
had cellars contrived within and between the piers.
The bridge had not indeed intirely recovered from its ruinous condition
in 1666, when it again suffered in the general conflagration of the
city, most of the buildings being totally consumed, except a few at the
south end, erected in the reign of King John; and the very stone work of
the bridge was so injured and weakened by this melancholy event, that it
cost the bridge-house 1500l. to make good the damage of the piers and
arches.
The stone work was, however, no sooner secured, than a sufficient number
of tenants offered, who agreed with the bridge-house for building leases
of sixty-one years, paying to the city the annual rent of ten shillings
per foot running, and to build in such a form and manner as was
prescribed. This was carried into execution with such dispatch, that
within five years the north end was completely finished, with houses
four stories high, and a street twenty feet broad between side and side:
after which all the old buildings at the south end were rebuilt in the
same manner.
In the year 1722, the Lord Mayor, Aldermen, and Common Council, being
sensible of the great inconveniences and mischiefs which happened by the
disorderly driving of coaches, carts, and other carriages, over the
bridge, published an order, that all carriages coming out of Southwark
into the city, should keep all along on the west side of the bridge, and
those going out of the city on the east side; appointing three persons
at each end to see this order executed: and this method is still
observed.
Three years after this order, the gate at the south end being greatly
damaged by a fire which broke out at a brush-maker’s, and destroyed
several of the adjacent houses, it was built with stone, with two
posterns for the convenience of foot passengers. This gate was finished
at the expence of the city in the year 1728.
At length the building leases being expired, the city was sensible of
the inconvenience of not having a footway, which had occasioned the loss
of many lives, from the number of carriages continually passing and
repassing, projected a plan for rebuilding the street over the bridge
with colonades on each side, by which foot passengers might be both
secured from the horses and carriages, and sheltered from the weather.
Part of this plan was a few years ago carried into execution, from the
first opening on the north-east end, and its advantages were so obvious,
that every body was desirous of seeing it completed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account