After the mines have been planted the following tests are made daily,
or more frequently if need be, the results being recorded carefully on
the form given at the end of the chapter. (Note: This applies also to
such test mines as may be kept planted for purposes of observation and
instruction.)
=Caution.=—If A. C. power be supplied from the casemate motor-generator,
there is no possibility of accidental firing of mines if the
motor-generator is not running; and when it is running the chance
is remote, since it would require the committing of three blunders.
However, the following precautions must be enforced rigidly:
(_a_) _Never start the motor-generator during the planting of mines nor
when any friendly vessels are in the neighborhood of the mine field._
(_b_) _Before starting the motor-generator for testing it, see that
all automatic switches are up, all firing switches open, and the A. C.
operating switch (No. 8 of the power panel) open._
1. =Test of the D. C. voltage.=—Plug in at the proper receptacle and
read the voltmeter.
2. =Test of the A. C. voltage.=—_Caution._—_First see that all
automatic switches are up, that the firing switches are open, and that
the A. C. operating switch No. 8 is open._
Close switch No. 4 up; close starting switch of motor-generator, and
when the latter has attained its full speed close switch No. 9 up; plug
in at the proper receptacle, and read the voltmeter. When the source of
power is the storage battery, the battery rheostat should be adjusted
until the A. C. voltage is 500 or above; when the casemate generator is
used, its field rheostat should be adjusted for the same purpose.
3. =Test of the mines.=—Leakage in mine circuits will be indicated
automatically by an increased brightness of the green lamp on the
signal block; an excessive leakage in any mine circuit may cause the
automatic switch to trip.
However, each mine should be tested separately, as follows:
With the D. C. on the D. C. busses of the power panel, close switch
7 up, open the power switch on the mine block of the mine circuit to
be tested, and put the M-AM “plug” on the upper point of the power
switch. If the automatic switch falls, adjust the solenoid or hold the
switch up while testing the circuit, otherwise the reading obtained
will be that of the red lamp and bell circuit. These operations put the
mil-ammeter and its protective lamp in series with the mine circuit.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account