4. The leads PX and BY (fig. 16) should be of loading or other heavily
insulated wire. They must be carefully insulated from each other, from
the ground, and from the walls or other parts of buildings. This is
especially true of the cable lead PX. In damp weather porcelain-knob
insulators and porcelain tubes (the latter for use in passing through
walls or partitions) may not be sufficient to afford proper insulation
for the cable lead. In such case the latter should be suspended _in
the air_ from the testing switch to the cable tank by means of several
chains of paraffined porcelain insulators suspended by marline or
protective tape which has been boiled in paraffin. These suspensions
should be in each case under cover and should be kept as dry as
possible. The length of the leads is immaterial. If loading wire is
used, the distance between supports should be short (not over 50 feet),
as this wire stretches considerably from its own weight, pulling out
the insulation and giving a very thin wall, particularly at points
of support. Extreme care should be taken to tighten up on the knob
insulators, in case they are used, just enough to hold the wire without
pinching the insulation.
5. Using a double connector, join the lead BY to the ground wire on the
cable above the surface of the water. Put a connector on the end of the
other lead so that it can be readily attached in turn to each conductor.
6. Any protective covering, such as armor, jute, etc., should be
removed from the ends of the conductors for a distance of about 12
inches, thus laying the insulation coating bare. This latter should
not be handled and must be kept scrupulously clean. With a _clean dry_
knife prepare each conductor of the cable to be tested by cutting
off about 1 inch of the insulation from each end of the wire and
then tapering the end of the insulation for about 1 inch, leaving a
perfectly clean surface. In damp weather dip each end of each conductor
into melted paraffin (not boiling, but heated above 212° F.). Secure
one end of the cable so that it is well separated from the surrounding
objects and separate the conductors so that no ends are touching.
7. Take one strand of a loading wire about 4 feet long and wrap it
two or three times around the projecting copper end of each conductor
at the other end of the cable, then connect it to earth. See that the
conductors at this end are dry. Leave the lead PX disconnected and
suspended in the air.
=II. Setting up the testing apparatus.=—1. Select a light, dry room as
near the cable tank as practicable.
2. Use dry cells for the battery. The voltage of the battery should be
such as to give a full scale deflection of the galvanometer through the
resistance employed for taking the constant (with shunt at ¹/₁₀₀₀).
Large galvanometer throws are essential for reliable results.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account