Manual for submarine miningUnited States. War Department
History
Manual for submarine mining
United States. War Department
Submarine mines -- Handbooks, manuals, etc.
5. Wire up as in figure 16, except that the leads from the testing key
should be carried to the battery through the double-pole single-throw
switch above referred to. (The battery switch should be opened whenever
any connections are made or altered.) All leads used in connecting up
the instruments should be of heavy copper, and stiff enough to hold
permanently any shape to which they are bent. They should be supported
at points of connection only, and should not lie on the table or within
an inch of each other.
=III. Testing the insulation of the apparatus.=—1. _Voltmeter test of
battery insulation._—This is a rough test, but should be included. A
serious ground can be much more quickly located with a voltmeter than
with the galvanometer.
(_a_) Disconnect the battery leads at the battery switch; connect +
lead of battery to + post of the voltmeter; connect the B end of the
lead BY to - post of the voltmeter; - lead of the battery should be in
the air. Close the voltmeter switch and read.
(_b_) Disconnect the voltmeter. Connect - lead of the battery to -
post of the voltmeter. Connect the B end of the lead BY to + post of
the voltmeter; + lead of the battery should be in the air. Close the
voltmeter switch and read.
If any deflection is obtained in either case, the battery or its
connections are grounded. Locate and remove the ground. (See Foster or
some other practical handbook.)
2. _Testing the battery voltage._—Connect the voltmeter across the
battery terminals. Read and record the voltage. (If there is no
voltmeter available which will read as high as the battery voltage,
take the voltage of the battery in sections and add, or make a
multiplier of one of the resistance coils in the ⅒ megohm box.)
3. _Testing the battery and the apparatus for grounds with the
galvanometer._—With a camel’s-hair brush go over all the instruments
and carefully remove dust. See that the instruments and connections are
dry. Do not blow on the instruments.
Open the battery switch. Connect the battery leads to the battery
switch. Disconnect lead PX at P and connect the earth leads BY and EY
to the key at “_cable post_.” (Y is grounded.) _Both_ battery leads are
left connected to the key. The shunt should be on 0. Close the battery
switch. Close the testing key to the right. Turn the shunt gradually to
the unity post. The galvanometer deflection should be zero. Turn the
shunt to 0. Reverse the testing key. Turn the shunt to the unity post.
The deflection should be zero. If any deflection is obtained, there is
a ground in the battery, the apparatus, or the connections. The test
of the cable should not proceed if a deflection is obtained in either
position of the key.
In reporting the voltage + to earth and - to earth as “zero” on form,
it will be understood that this means zero using the galvanometer, as
herein described.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account