The system of construction in force among the ancient Egyptians resembles
in many respects that of the Greeks. The stones are often placed together
with dry joints, and without the employment of any binding contrivance, the
masons relying on the mere weight of the materials to keep them in place.
Sometimes they are held together by metal cramps, or sometimes--as in the
temple of Seti I., at Abydos--by dovetails of sycamore wood bearing the
cartouche of the founder. Most commonly, they are united by a mortar-joint,
more or less thick. All the mortars of which I have collected samples are
thus far of three kinds: the first is white, and easily reduced to an
impalpable powder, being of lime only; the others are grey, and rough to
the touch, being mixtures of lime and sand; while some are of a reddish
colour, owing to the pounded brick powder with which they are mixed. A
judicious use of these various methods enabled the Egyptians to rival the
Greeks in their treatment of regular courses, equal blocks, and upright
joints in alternate bond. If they did not always work equally well, their
shortcomings must be charged to the imperfect mechanical means at their
disposal. The enclosure walls, partitions, and secondary façades were
upright; and they raised the materials by means of a rude kind of crane
planted on the top. The pylon walls and the principal façades (and
sometimes even the secondary façades) were sloped at an angle which varied
according to the taste of the architect. In order to build these, they
formed inclined planes, the slopes of which were lengthened as the
structure rose in height. These two methods were equally perilous; for,
however carefully the blocks might be protected while being raised, they
were constantly in danger of losing their edges or corners, or of being
fractured before they reached the top (Note 7). Thus it was almost always
necessary to re-work them; and the object being to sacrifice as little as
possible of the stone, the workmen often left them of most abnormal shapes
(fig. 52). They would level off one of the side faces, and then the joint,
instead of being vertical, leaned askew. If the block had neither height
nor length to spare, they made up the loss by means of a supplementary
slip. Sometimes even they left a projection which fitted into a
corresponding hollow in the next upper or lower course. Being first of all
expedients designed to remedy accidents, these methods degenerated into
habitually careless ways of working. The masons who had inadvertently
hoisted too large a block, no longer troubled themselves to lower it back
again, but worked it into the building in one or other of the ways before
mentioned. The architect neglected to duly supervise the dressing and
placing of the blocks. He allowed the courses to vary, and the vertical
joints, two or three deep, to come one over the other. The rough work done,
the masons dressed down the stone, reworked the joints, and overlaid the
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account