“Four squads worked at a time, each one consisting of a foreman and
from 25 to 30 miners. Each squad worked six hours without
interruption. This shift, apparently light, was found, on the
contrary, to be very heavy, owing principally to the development of
nitric gases which poisoned the air, and to the dust caused by the
drills.
“At first the only explosive used was military gelatine; later,
dynamite-gelatine. The system of over-charging the holes was always
adopted, in order to reduce the _débris_ to minute particles, easier
to be transported and unloaded. The work was carried on in sections,
varying from 1·80 by 1·80 metres to 2 by 2. The flat stretches of the
tunnel were laid with Decauville rails. All material was carried out
in cars and dumped into a hopper discharging into a large pipe. (The
dump was accumulated at a point beyond the observation of the
Austrians.) The average rate of progress was 5·10 metres per day.”
It may be well to explain here that it was not possible to begin
tunnelling on the same level at which the mine was to be exploded, but
considerably more than 150 feet below that level. The tunnel, had,
therefore, to be driven on a steep gradient. Another point which the
report does not make clear should be borne in mind, viz., that the
tunnel divided in the heart of the Castelletto, the main bore being
driven on to where the mine was to be exploded, while a smaller
branch--referred to below as the “Loop-holed Tunnel”--was run up to a
point where favourable exit could be obtained for charging into and
occupying the crater of the exploded mine. In all 507 metres of tunnel
had to be driven, involving the excavation of 2,200 cubic metres of
rock. The details of this work are given in the report as follows:
(A) Chamber for Sullivan Compressor: Dimensions: 5 × 8 metres; average
height 2·20 metres.
(B) First part of gallery to second dump of material. Length 72
metres; inclination 38·70 per cent.; elevation gained 25·90 metres.
(C) Second dump of material, established in order to free space for
further work and reduce the length of transportation.
(D) Ingersoll Group chamber. Dimensions: 4 × 6·50 metres; average
height 2 metres.
(E) Cut from the gallery of the second dump of material to the
beginning of the ascent to the mining chamber. Length 136 metres;
inclination 4·70 per cent.; elevation gained 6·40 metres.
(F) Ascent to mining chamber. Length 22 metres; inclination 36·30 per
cent.; elevation gained 10·75 metres. (This ascent, in order to
facilitate tamping, was worked by dividing it into three sections of 1
× 1·60 metres, at nearly right angles.)
(G) Mining chamber. Dimensions: 5 × 5·50 metres; average height 2·30
metres.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account