“Upwards of five hundred husky Serbs can do a deal of work,
but it didn’t take more than three days of log-rolling and
rock-packing to show that--even at the pace we were hitting it--that
hundred-yard-long, thirty-feet-high dam wouldn’t be finished before
the next season, and that, even if we did get it done some time, the
stuff we were putting in it was too loose to stop water. It was at
this stage of things that I had _my_ big idea. I had worked in
hydraulic mines in the West, and while we had nothing to rig up a pipe
and nozzle from, there _was_ a chance to divert a little mountain
torrent that came tumbling down from the snows only a few yards below
our dam site. Why not, I suggested, build up only a narrow crib of
boulders and pine logs to act as a barrier, and then bring over this
little torrent--it was flowing about a hundred miner’s inches at this
time--and let it sluice down the loose ‘conglomerate’ from the
four-hundred-foot-high cliff through which it flowed? Because no one
had anything else to offer, we decided to try the thing.
“We used up a good half of our poor little store of powder in making
the cut to bring over the stream, but the job was mostly easy digging,
and we finished it in three days. My young ‘hydraulic’ sure tore down
a lot of rock and gravel, but, as we couldn’t rig up anything to
confine it properly, it only spread out in a big ‘fan,’ which in turn
was sluiced away by the river. That fairly stumped us, and when on top
of it a big storm came on and brought down a flood that washed away
all our cribbing, we chucked up in disgust our project of ‘harnessing
nature’ against the Austrian and began to plan raids again.
“All that night it rained cats and dogs, and when I looked out of my
hut the next morning the river was over its banks and humping it like
a ‘locoed’ mustang. But the funny thing was that the cascade from the
little stream we had diverted seemed to have disappeared. At first I
thought it had bucked its way back into its old channel, but when I
went down to look I found that it had been ‘swallowed’ up by the
cliff. Five times as big as on the night before, it came tumbling down
over an up-ended stratum of slate, to disappear in a foamy
yellow-white spout into a deep crack it had sluiced into the soft
‘conglomerate.’ At the bottom of the cliff it came boiling out from
under the angling slate-layer in a stream that looked to be about
equal parts of gravel and water. My baby ‘hydraulic’ had evidently
undermined a sloping section of the cliff for a hundred feet or more,
and only the tough slate stratum was staving off a big cave-in. How
big a cave-in it was going to be, and what it was going to lead to, I
never guessed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account