Mineral Survey Procedures Guide, 1980 — John Shaqi
Mineral Survey Procedures Guide, 1980
Science
Mineral Survey Procedures Guide, 1980
Cadastres -- United States; Mineral resources conservation -- United States
_Location notice_ shall be posted at one corner stating name of claim,
material located, name of locator(s), and description by legal
subdivisions or metes and bounds with tie to natural object or permanent
monument, if on unsurveyed lands.
_Monumentation_: A substantial wood post, four feet high, set securely
in the ground, or a substantial stone monument, shall be set at each
corner of the claim, regardless of whether the claim is on surveyed or
unsurveyed lands.
_Discovery Work_: None required.
_Recording_: A copy of the location notice shall be recorded with the
county clerk within 90 days of location and posting.
Other:
_Additional_ and _amended locations_ and _relocations_ provided for.
_Abandonment_ is provided for by filing for record a statement with the
county clerk.
_Penalties_ are provided for falsifying location notices and affidavits,
defacing and changing location notices, destruction of corners,
hindering or preventing performance of annual labor and trespass, except
for determining performance of annual labor or locating on government
land.
_Annual labor_: Affidavit to be filed for record with county clerk 60
days from end of assessment year.
_Private Lands_: Owners may make regulations, not in conflict with laws
of the United States or New Mexico; governing the location of mining
claims and file for record with county clerk.
1–41 NORTH DAKOTA
Lode Claims:
_Location Notice_: to be posted at point of discovery containing name of
lode, name of locator(s), date of discovery, length, in feet, each way
from discovery, and width, in feet, on each side of lode. _Width limited
by state law to 150 feet on each side of lode; may be modified by
county._
_Discovery Work_: Shaft, cut or tunnel at a depth sufficient to disclose
the vein or lode, or adit ten feet along vein or lode, or drill hole,
not less than one and one-half inches in diameter and of sufficient
depth to reach, cut or expose vein or lode. Work to be completed within
sixty days from time of uncovering or disclosing a lode (posting).
_Monumentation_: Eight substantial posts, hewed or blazed on the side
facing the claim, marked with the name of lode and corner, end of lode,
or side center sunk in ground or in monument of stone.
_Recording_: Within sixty days file for record with the county register
of deeds a location certificate containing, in addition to information
in location notice, the general course of the vein, and date of
location.
Placer and Other Mining Claims:
No state law.
Other:
_Additional certificate_ and _relocation_, both by owner and abandoned
claims, provided for.
_Annual labor_: Provided for, but no affidavit.
_Surface owner_: May demand security from miner.
1–42 OREGON
Lode Claims:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account