The only real use for a cross-plank road is to secure better traction on
grades exceeding ten or twelve per cent, and then it should be laid with
a space of about one inch between the planks. Even in such cases it
would be better to use some other method for securing traction, such as
sanding the track or winding the drive wheels with a light cable. The
waste of material and the excessive vibration limit the use of this type
of road.
_Fore and Aft Pole Road._ In the fore and aft pole road, poles from
twelve to fourteen inches in diameter are hewn on one or more faces and
laid longitudinally with the road, with one or more logs for each wheel
track. This type of road is commonly used by motor truck loggers and is
one that lends itself readily to their use. It is the most practical
road that can be built unless there is a small saw-mill handy to saw
planks for the fore and aft plank road. The smaller material growing
along the right of way is used at an expense of only what it costs to
fell it, hew it and put the poles in place. Hemlock poles may be used to
advantage.
Some operators use the single large pole placed on cross-ties eight or
ten feet apart and use lighter eight-inch poles placed on the outside
for a guard rail to keep the truck from leaving the track. The main pole
is laid in a ditch about eight inches deep, leaving it half buried. This
helps to keep the poles from spreading and increases their firmness and
strength. The pole is notched into the cross-ties, which are made of
logs not less than eight inches in diameter, and is securely nailed or
bolted to prevent it from rolling. The outside guard rail is laid on
the surface of the ground close to the main track and is securely braced
from the outside by means of posts sunk into the ground or it may be
spiked to the main pole or to the ties. When running with the trailer on
this narrow type of road, the guard rail is very necessary.
After the poles have been laid, the sub-grade should be ditched in the
center deep enough to carry away the water that falls in the middle of
the road. The success of the road depends to a large extent upon good
drainage.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account