The first thing now to be done was evidently to remove the broken iron
plates, and to rivet in new ones in their place. In order to provide
for additional strengthening of the vessel inside, the large timbers
which had been purchased were made use of, as being exactly adapted
for the purpose. Three of these were placed across the angle-irons
against the side of the vessel, the longest and stoutest, which was
twenty-three feet in length, one foot broad, and six inches thick,
being placed highest up, about two to three feet below the deck. This
was secured in its place by bolts, each a foot long, which were run
through the ship's side, one at the centre of the space between each
of the angle-irons. As there would, however, be a space left between
the face of the beam and the side of the vessel, except at those points
where it rested upon the angle-irons, this interval was filled up with
well-seasoned red pine, which added very much to the solidity of the
contrivance. To "make assurance doubly sure," two other beams, of the
same depth and thickness, but not of the same length, and secured in a
similar manner, were also employed. By this means, it is very evident
that the ship was made a vast deal stronger than she ever was before,
though not stronger than was proper for her size and shape. The whole
length of the new plates put in the ship's sides was eight feet two
inches; and so effectually was the work done that the whole of it
remained perfect, stringers and all, at the end of two years and a half
of severe and uninterrupted service.
These contrivances added very little to the weight of the vessel, and
gave it very great support in the weakest part, and just where it was
most required, to enable her to carry coals on deck, &c.
[Illustration:
PLAN SHEWING THE SIDE OF THE NEMESIS REPAIRED AND
STRENGTHENED BY STRINGERS.
A The old plate cut away between the angle-iron frames.
B Part of the old plate left remaining inside the new.
C Stringers, 1ft. by 6in.; the space under them between the
angle-irons made solid with wood.
D Knee.
E Deck angle-iron.
F Angle-iron side-frames.
G Coal-box bulkhead angle-iron.
H Paddle-beam, of wood, 21 in. by 15.
N Diagonal bracing of wood between the stringers.
N.B.--Stringers secured by seven-eighths in.; bolts driven
through all between each two angle-irons.
]
[Illustration:
END VIEW OF THE STRINGERS, SHEWING ALSO THE SECTION OF
THE SHIP'S SIDE.
I Deck beam of iron.
K Flat of deck.
L Covering board, 12 in. by 4 in.
M Waist stanchion.
C Ends of the stringers.
]