We were imprisoned in the ice on September 23d, and from my last
observations I inferred that our location was about latitude 77° North
and longitude 160° West. The sun made his appearance for a brief
interval each day, and I calculated that the long Arctic night would
be fully set in by the last of October. The rifts in the roof of our
prison afforded us no opportunity for determining our location. Our
recent danger had revealed the fact that we were moving. We tried the
sounding line and found that we were in deep water, and that our motion
was evidently due to the motion of the ice-field. We were floating
at the mercy of the winds and ocean currents. But whither would they
carry us? None could tell. Assuming, however, that the currents were
north-bound, and reasoning from the fact that the motion of the earth
was from west to east, the tendency being, as it were, to slip from
under us, we concluded that as long as the ice was floating freely, our
general motion would be toward the west and north.
For the present we were safe and comfortable with the ship securely
fastened to the solid walls of our prison. But we knew summer would
come, and the warm rays of the sun would beam down on us for months,
melting and breaking up the frozen surface of the ocean which was now
our security, but might then become the cause of our destruction.
Our future safety, and the success of the expedition, demanded that
we should have easy access to the surface, so that we could make the
necessary observations, and, if possible, find some means of providing
for the safety of the ship and crew when the ice went to pieces. This
was the task before us, but we had no means of calculating the time
it would take. All we knew was, that the two ice mountains by coming
together had formed a roof over our heads, and towered many feet above
the ship's masts, and if their other dimensions were in proportion, it
might take a long time for us to tunnel through to the surface.
We felt that there was no time to lose. All needful arrangements were
soon perfected under the direction of Battell, who took charge as
engineer and manager. The ice-bench on our larboard was selected as the
point of starting. The crew was divided into three reliefs, each with a
foreman, and the work of excavation went on without intermission. This
arrangement gave eight hours for work in the tunnel, and sixteen for
rest and recreation.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account