Notices on the outlasting war sitesBelgium. Ministère de la défense nationale
History
Notices on the outlasting war sites
Belgium. Ministère de la défense nationale
War memorials -- Belgium; World War, 1914-1918 -- Belgium
These two pieces will be the soul of the counter-battery, they will be
upheld in their action by a special group of numerous heavy batteries
which will make opposition on all german batteries opening fire on the
two heavy guns.
The plan was prepared, but to realise it, important and preliminary
works had to be executed, which took five days after Captain Jaumotte’s
reconnoitring.
These works consisted thus: first of all, the building of firing
emplacements for the heavy artillery; establishing many telephone
connections, needed since the creation of the special group, connections
which had to perform not only the centralisation of the command, but
also a perfect understanding between the director of the firing, the
batteries and the observation-posts and the cross registering section,
as well as the creation of antennas to receive the messages of aerial
observations.
The railway battalion, pushed on after three days of splendid and
extraordinary efforts, the works sufficiently far to render the point of
Eggewaertscappelle capable of bearing the firing of the heavy guns. The
group of telegraphists and telephonists accomplished at the same time,
grand and important works of liaison, which altogether constituted the
tool of the firing director.
A firing program was elaborated, a program which led the action on
Leugenboom and on the Tirpitz battery (see site n^o 4) at the same time.
The firing on the Tirpitz was assured by two heavy guns of 305 in
position on the point of Coxyde-Bains.
The 13^{th} of May, the two heavy guns of 305 were brought to the
place of firing which had been chosen—the switch-point of
Eggewaertscappelle—and a nice clear day was waited to open action.
That beautiful day was longed for right up to the 20^{th} of May 1917.
The execution of the genuine program was preceded by an independant
firing directed on the German observation-post installed in the belfry
of Eessen, with a 240 (10 inch.) gun in position at the East of Burg
Molen, upheld by the special group. The tower was partially demolished.
About 11 o’clock, the heavy guns of 305 of Eggewaertscappelle fired
their first shot on Leugenboom, while the gun of Burg Molen continued
its demolishing and blinding work on the enemy’s observation-post. A
little while after the guns of Coxyde-Bains entered in action in their
turn against Tirpitz battery. The observation of these firings were both
terrestrial and aerial.
The firing program was continued the following days when the weather was
favourable for observation.
On the 25^{th} of May, an aerial photograph of Leugenboom position was
taken. It did not disclose the least damage to the concrete block, but
its clearness sufficiently noted the gun carriage not yet armed, in the
centre of the honeycomb which formed the platform.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account