Every four courses of the wall stones (about 11 feet) the derrick was
raised, perhaps by unshipping the boom and using it as a lesser mast
to raise the mast proper. Square timber sticks were then beginning to
be used for staging, instead of the round trunks of small trees and
saplings previously used. A sketch of the monument shows a squared
timber stage for pointing the joints. Such a stage could be much more
easily erected, and was more reliable than the round sticks, tied at
the joints by cords.
On paper, Willard had performed the painstaking task of dimensioning
every stone, each with its top (the build) a little narrower than
its bottom (the bed), so that the true taper of the obelisk would be
maintained. To set the stone to line was the chore of the erecting
force. On the top of the stone already in place lime mortar was spread,
enriched with hydraulic cement, and with a sprinkling of iron filings.
(A popular, modern, commercial waterproofing compound utilizes the
fact that, upon oxidizing, iron particles mixed with the cement mortar
expand, thus reducing the voids and producing a denser mass when the
mortar sets.)
Temporary wooden wedges would be placed at the corners of the stone
already in place, to support the heavy new stone until the mortar had
hardened. When the ponderous stone had been speedily raised from the
ground to a level a few inches above the mortar, the engine would be
stopped; the derrick adjusted to right or left, and in or out, until
the stone was very closely in line. Next, riggers would push on the
bridle chain which attached to the two lewises in the stone’s top
surface, guiding it to its true position in its gentle descent as the
engine lowered it the few inches needed to bed it. A tiny fraction of
an inch “out-of-line” would be serious, for such errors if repeated, or
if not compensating, would visibly throw the monument out of line. On a
light stage high above the ground, bracing themselves against gusts of
wind, the riggers would be intent on the necessity for such accuracy,
but not forgetting their own safety, for no careless workman could work
for Savage. They would remember that, while laying the last stone of
the 12th course, at the southwest corner, one man had been pushed off
(the only death on the project).
_Profitable Project_
Happily, the good riggers raised their monument, course by course, to
the top. They were under a boss who knew his trade, and he was making
money--the sign of content on any construction project. (Savage made
some more money after the monument was finished, when he retained the
steam engine that had been used for hoisting stone, for the purpose
of raising a passenger car to the top. For the car ride he collected
$0.20, as against the $0.125 for visitors who climbed the stairs.)
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account