Up to 1883, when the McIlwraith Government created the Hydraulic
Engineer's Department by appointing Mr. J. B. Henderson to organise
it, little had been done by the State for the improvement of the water
supply of the country except in cities and towns. At that time no
artesian water was known to exist in Queensland, but there was a
popular belief that there were great underground supplies, especially
in Western Queensland. Many station-owners had been active, and the
diamond drill had been brought into use, but deep drilling had
not then been undertaken. In October, 1884, the Hydraulic Engineer
reported that he had just visited Widgeegoara Station, where the
owners, Messrs. E. and J. Bignell, partly by sinking shafts and partly
by boring, had obtained an underground pumped supply aggregating
94,000 gallons every twenty-four hours. This resulted from sinking
four 5 ft. x 21/2 ft. shafts an average depth of 102 ft. each, and
thence boring and tubing below the bottom of each shaft to the average
depth of 161 ft. Of the total quantity 20,000 gallons a day was
obtained from the Four-mile well, a shaft sunk to a depth of 150 ft.
below the natural surface. Besides this there was a homestead well
33 ft. deep. Analyses of the water showed that, in the opinion of the
Government Analyst, only in one bore was it useful for watering sheep,
it being brackish; but according to the station reports the supply
from the Four-mile well and Nos. 1 and 2 shaft-bores was good
stock water. Mr. Henderson warmly commended the Messrs. Bignell's
enterprise.
IMPROVED BORING MACHINERY.
During the same month the late Hon. George King, of Gowrie, brought
under the notice of the department a report by Mr. Darley, C.E.,
to the Government of New South Wales respecting certain American
well-boring machinery by the use of which in Mr. King's opinion
three-fourths of the cost of L6,000 incurred by his firm in sinking
shafts in the Warrego district might have been saved. Besides which
much greater depths could be reached, a machine costing L600 in
America being capable of boring 2,000 ft. The matter being referred to
the Hydraulic Engineer, that officer made inquiries which induced him
heartily to endorse Mr. King's suggestion that the Government should
secure from America a machine with two men experienced in working it
and capable of themselves making any ordinary repairs. Mr. Henderson
also recommended that a staff should be trained by the Americans after
arrival, and expressed the opinion that this course would save both
money and time, and prove a large gain to the colony. But he reminded
the Minister that until there had been an abundant rainfall extensive
operations in bore-sinking in the West could not be carried on, though
he advised the introduction of a sufficient number of machines and
enough tubing in order that during the next season, if rain fell, work
should be vigorously commenced.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account