Our First Half-Century: A Review of Queensland Progress Based Upon Official InformationQueensland
History
Our First Half-Century: A Review of Queensland Progress Based Upon Official Information
Queensland
Queensland -- History
On 4th September, 1885, the Hydraulic Engineer replied in unequivocal
terms to a minute of his Minister requesting him to comply with the
wish expressed that he should purchase a Victorian diamond drill, then
under offer, for coal-prospecting purposes. Mr. Henderson strongly
recommended that no drill be purchased unless capable of boring holes
at least from 5 in. to 2 in. in diameter. He also pointed out that
where drifts and loose gravels were met with, and tubed, a deep bore
must be commenced of large diameter to ensure success. Although the
proposed drills were not ostensibly to be used for water-finding, it
is evident that the Hydraulic Engineer, in reporting upon them, had
that kind of work in view.
GOVERNMENT URGED TO IMPORT PLANT AND MEN.
On 2nd December following the Hydraulic Engineer addressed the
Minister touching water-boring operations, and pointed out that, while
there would be no difficulty in importing the machinery and appliances
requisite for deep bores, he was convinced that men must be introduced
from America to start and teach others here to work them. He
recommended that an efficient plant should be ordered capable of
boring up to 12 in. in diameter to a depth of 2,500 ft., for (say)
L1,000, delivery at the works, and four good drillers under a two
years' engagement brought out to work them at 21s. to 23s. per day,
apparently of twelve hours; board, lodging, and travelling expenses to
be defrayed by the Government.
OBSTACLES FROM DROUGHT.
On 20th February, 1886, the Hydraulic Engineer wrote that,
understanding from conversations with the Minister that "the policy of
the Government is to carry on water conservation works and boring for
underground water with increased energy, he recommends the purchase of
three Wright and Edwards' boring machines, capable of reaching a depth
of 1,000 ft., for delivery within four months from the date of order."
Three days later Mr. Henderson wrote:--"Unfortunately it can be said
with much truth that, ever since the department's existence, the
seasons have been unfavourable in the extreme for carrying out its
plans." After mentioning the specific difficulties encountered, he
added:--"I do not share in the idea that the late rains broke up the
drought, as I cannot disguise from myself the fact that they have not
been general, or even yet of sufficient quantity."
FIRST BORING STARTED AT BLACKALL.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account