United States. Navy; World War, 1914-1918 -- Naval operations
In preparing her for sea the engineers found it necessary to overhaul,
partially redesign and reconstruct many important parts of the
_Leviathan's_ engines. As in her case, the most serious typical damage
was done by breaking the cylinders, valve-chests, circulating pumps,
steam and exhaust units in main engines; dry-firing boilers, and thus
melting the tubes and distorting furnaces, together with easily
detectable instances of a minor character, such as cutting piston and
connecting rods and stays with hack saws, smashing engine-room telegraph
systems, and removing and destroying parts which the Germans believed
could not be duplicated. Then there was sabotage well concealed: rod
stays in boilers were broken off, but nuts were fastened on exposed
surfaces for purposes of deception; threads of bolts were destroyed, the
bolts being replaced with but one or two threads to hold them, and thus
calculated to give way under pressure. Piles of shavings and inflammable
material with cans of kerosene near suggested the intention to burn the
vessels, intentions thwarted by our watchfulness, while the absence of
explosives has been accounted for purely on the ground of the risk which
the crews would have run in attempting to purchase explosive materials
in the open market.
No great amount of damage was done to the furnishings or ordinary ship's
fittings. Destructiveness was similar in character throughout all the
vessels and involved only important parts of the propulsive mechanism or
other operating machinery.
We have spoken of the investigation of the vessels by Shipping Board
engineers. They were appointed by the board not only to make a survey,
but to superintend repairs. The collector of the port of New York also
named a board of engineers (railroad engineers) to investigate the
damage done the German ships, and to recommend repairs through the
agency of welding. The railroad men, after due study, believed that
their art could be applied to as great advantage on ships as upon
locomotives. The Shipping Board engineers recommended, on the other
hand, the renewal of all badly damaged cylinders. The railroad
engineers, on the other hand, set forth their opinion that all damaged
cylinders could be reclaimed and made as good as new.
As a result of this difference of opinion, nothing was done until the
larger German craft were turned over to the Navy Department to be fitted
as transports, in July of 1917. It was then decided to use welding and
patching on the vessels.
In no cases were the repairs to the propulsive machinery delayed beyond
the time necessary to equip these ships as transports. Electric and
acetylene welding is not a complicated art in the hands of skilled men;
for patching a hole, or filling the cavity of a great crack in a
cylinder, say by electric welding, may be compared to a similar
operation in dental surgery.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account