In the saving that we have just shown we have presupposed an absolutely
universal substitution of electric for steam power all the way across the
land. This however is not practical to-day; nor is it likely to be
practical in any day to come, for every mile of our 275,000 miles of
American railroad system. On the other hand this huge estimate of national
saving is based entirely upon the coal-consumption basis. The most
impressive savings that you shall see before you are finished with this
chapter are those accomplished by our lines which have bended water-power,
hitherto wasted, to the movement of their trains. I have stood upon the
brink of Niagara Falls and there seen train after train arrive and depart,
each hauled by a steam locomotive. And all the while I knew that the force
and power of that mighty cataract was lighting the homes and driving the
street-cars of Toronto and of Syracuse--by land, respectively one hundred
and 150 miles distant. What a travesty upon efficiency!
For the moment however we are seeing the question, not in fine, but in
large. It is terribly large, terribly wasteful, if you please. For not
only is our steam locomotive a laggard in his over-greed for food but he
is lazy into the bargain. A fearful proportion of his time he spends in
resting or in being refitted for his work. For each hour that he spends
out upon the line he spends another hour in the roundhouse--and this of
course quite outside of the yearly visit to the shops for complete
overhauling and repair. The traffic of Fifth Avenue, New York, or Michigan
Avenue, Chicago, would never move if motor-cars were permitted to park
alongside their busy curbs. One reason why the traffic upon our railroads
has not moved better in times of stress is because there has been too much
parking both of locomotives and of cars, particularly of the first.
An Eastern trunk-line railroad which a dozen years ago was having a
fearful time moving its freight brought in a consulting engineer for an
opinion as to the increase of its facilities. Like most engineers the
outside expert saw the problem as a field-day possibility for contracting
concerns--and engineers. A new classification-yard here, great additions
and rearrangements to others there, at other places a long stretch of
additional main-line trackage--the trick might be done anywhere from sixty
to one hundred millions of dollars there in yester-year.
These figures staggered the president of the road. He was not satisfied
and so turned again for outside consultation, this time with the
hard-headed general manager of a Western line.
"Tell me what you can make of it?" he asked.
The Westerner took a hurried trip over the line and had his report ready
within sixty minutes thereafter; it was short, concise, verbal.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account