"Give me a couple of million dollars' worth of more locomotives and in a
week I'll have your problem solved. You don't want more yards, to be
clogged up in turn. You want yard shortage--and line movement. If you have
a sufficiency of motive-power you won't need many yards, not as many as
you have to-day. Your stuff will keep moving, not hanging around on
side-tracks."
* * * * *
The problem of that Eastern road of a dozen years ago is to-day that of
virtually every trunk-line of the Northeast. Remember, if you will, that
for more than a decade there has been no main line trackage laid down east
of Pittsburg or Cleveland. Previous to that time a considerable amount of
relief work had been done by a half-dozen or so of the larger roads in
that territory. But the relief that these changes gave has long since been
swallowed up until to-day it is hardly apparent. And the steadily growing
traffic demands fresh relief.
How it can be given is not as easy a problem to the big engineers. The
Pennsylvania can and has planned still more low-grade relief-lines across
and through the Alleghany Mountains, but Pittsburg still remains its
bottle-neck--in there between the high hills and all but defying the
railroad engineers. The New York Central needs more main-line trackage,
but far more does it need relief of its own bottle-necks--at Albany and
again at Buffalo. It is the problem of the cities that counts--not merely
Albany or Buffalo or Pittsburg, but New York and Boston and Philadelphia
and Baltimore and Cleveland and Cincinnati and St. Louis and Chicago.
There is no use in laying down additional main tracks when the terminals
in the hearts of these great cities are so sadly congested as to take a
freight-car as long to move through a single one of them as from three
hundred to five hundred miles on open line.
The smooth and shiny steel rails that slip through each of these congested
traffic-hubs are their Fifth Avenues and their Michigan Avenues too. We do
not permit the gasolene locomotive to park and obstruct these highways of
asphaltum. But the laggard steam locomotive is permitted to loaf in great
roundhouses along the steel highway. He is to-day not merely a laggard but
an actual obstructionist. I hinted but a moment ago at the time he must
spend between runs resting and being more or less overhauled--fires
cleaned, machinery overhauled, flues calked and the like, twelve hours out
of each twenty-four. Moreover he requires water each seventy-five miles
and a fresh supply of coal each 150.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account