One day while the Gatun dam was in the earlier stages of its
construction in 1908, a newspaper correspondent was temporarily detained
at Gatun while crossing the Isthmus. Idly, to pass the time away, he
strolled out on the dam to where he saw a group of men gathered. He
found them discussing a small break at the edge of the dam upstream; a
break not caused by any pressure of the water, for the water had not
reached that point, but by the weight of the heavy superstructure
pressing upon the semi-fluid core of the dam which then had not had
sufficient time for drainage and drying. The dispatch which the
correspondent sent north as the result of his casual observation of the
slide, was seized upon by the advocates of the sea-level canal as a text
from which to argue the entire impracticability of the lake-level
project. The agitation became so general and so menacing that President
Roosevelt was impelled to appoint a commission of seven engineers of
high professional standing and technical knowledge of dam building to
visit the spot and report upon the menace. Their verdict was that the
Canal engineers had gone far beyond the necessary point in making the
dam ponderous and safe. Secretary of War Taft, who happened to be on the
Isthmus when the break occurred, declared that it was “insignificant
when one takes into consideration the whole size of the dam”.
When the tricky Chagres gets on one of its rainy season rages the
spillway by which the dam is pierced at about its center will be one of
the spectacular points on the Canal line. That river drains a basin
covering 1,320 square miles, and upon which the rains in their season
fall with a persistence and continuity known in hardly any other corner
of the earth. The Chagres has been known to rise as much as 40 feet in
24 hours, and though even this great flood will be measurably lowered by
being distributed over the 164 square miles in Gatun Lake, yet some
system of controlling it by outlets and flood gates was of course
essential to the working and the safety of the Canal. The spillway is
the center of this system, the point at which is the machinery by which
the surface of Gatun Lake can be at all times kept within two feet of
its normal level, which is 85 feet above the level of the sea.
[Illustration: PARTLY COMPLETED SPILLWAY, 1913
The river was low when this picture was taken. At high water it will
flow over the completed structure shown at the right]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account