Petroleum; Petroleum -- Great Britain; Petroleum engineering
The Russian oil-fields--those of Baku and Grosny--are situated at great
distance from the coast, and the necessity of connecting both fields
with the export port of Batoum, on the Black Sea, has frequently been
put forward as a project offering the one solution of the difficulties
attending the retention of a large export oil trade. The Grosny
pipe-line is still a scheme for future solution, but that affecting
Baku has been solved by the laying of a pipe-line from Baku to Batoum.
This line, which is approximately 650 miles long, runs direct between
the two oil centres and, assuming it operates 24 hours in the day, has
a capacity of transporting over 3,000 tons of oil daily. Inasmuch as
the Russian oil refineries are at Baku, the line is used solely for
the transportation of the refined products. The line itself is laid
alongside the railway line of the Transcaucasian Railway, at a depth of
4 feet, but many strange stories are related as to the tapping of it at
various points, and a lucrative trade being done in the oil so caught.
When normal conditions return to Russia and the petroleum industry
rights itself, Russian petroleum products will again come on the
international markets, and in this respect the Grozny oil will be able
to secure an outlet via Novorossisk.
Roumania can also boast of a main trunk pipe-line for refined products
from the inland refineries direct to the port of Constantza. This
important project, which has been carried out practically by the
Government itself, was just about ready for service when the European
War broke out: it has, therefore, had little time in which to display
its practical use to the petroleum industry at large. When one
recollects that Roumania’s future, so far as the petroleum industry
is concerned, lies in the direction of the building up of its already
established export trade in petroleum products, the necessity for
such a trunk pipe-line to the seaboard has been obvious for many
years. Unlike the case of the United States, there are no interesting
events to recall which delayed the advent of this new form of land oil
transportation. There is only one oil pipe-line of any considerable
length in the United Kingdom and this runs across Scotland from Old
Kilpatrick (on the west) to Grangemouth (on the east coast), its
terminal being in close proximity to the naval base at Rosyth. The
line, which is 36 miles long, was laid to circumvent the activity of
enemy submarines, but was only completed in November, 1918, after the
conclusion of the European hostilities.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account