Portable Flame Thrower M2-2United States. War Department
History
Portable Flame Thrower M2-2
United States. War Department
Flame throwers -- Handbooks, manuals, etc.; United States. Army -- Equipment -- Handbooks, manuals, etc.
_i. Exterior metal surfaces._ Scrub exterior metal surfaces clean of
fuel to prevent fire hazard. Allow to dry before using again.
_j. General inspection._ Carefully examine all other parts, adjust as
necessary, and replace any which are damaged.
56. SERVICE AFTER SIX FIRING MISSIONS.
After the flame thrower has been used on six firing missions or the
equivalent in training work, experienced personnel should follow these
directions:
_a. Before-operation and after-operation service._ Follow the same
procedures as in Paragraphs 52, 53, and 55.
_b. Test firing (or simulated firing)._
(1) If tactical conditions permit test firing at a suitable test range
(Par 15), fill the fuel tanks with fuel. (Pars 37 through 40)
(2) If test firing with fuel is impracticable, fill fuel tanks with
clean water. (Be sure to dry all parts after test.)
(3) _Remove filling-plug assembly._ (Par 69) Fish out the retainer rod
and chain by means of a bent wire.
(4) Do not unscrew the safety-head plug.
(5) Insert the testing plug with 0-to 500-pound pressure gage (plug and
gage are from service kit) in the filling-plug opening. Tighten testing
plug in seat with wrench.
(6) Fully charge pressure tank. (Par 32)
(7) If test firing with fuel, load ignition cylinder. (Par 18)
(8) Open pressure-tank valve and simultaneously observe pressure in
fuel tanks by reading gage. The gage indicates the pressure in both
tanks. It should be between 350 and 390 pounds per square inch.
(9) Read the gage at the expiration of not less than 5 minutes. The
tanks should have a pressure reading of not more than 390 pounds. If
the pressure continues to increase beyond 390 pounds and the safety
head blows, replace the safety head and the pressure regulator.
(10) Fire by operating controls (or simulate firing if tanks are filled
with water). The burst should last 3 seconds, during which time the
pressure should not drop below 260 pounds.
(11) If the pressure does not conform to the requirements stated in
(8), (9), and (10), adjust the pressure regulator upward or downward.
(Par 67 _d_)
(12) While the above test firing is proceeding, check for leaks at all
joints and connections on the tank group. The pressure system should
be checked by painting the joints with soap-and-water solution and by
looking for bubbles which indicate leaks. For replacement of parts
where pressure leaks, see Paragraph 66. Fuel leaks may be seen without
soap and water. For repair of fuel leaks, see Paragraph 75 _e_. The
nozzle should be observed by removing the ignition shield. Nozzle
leaks are corrected by cleaning, adjusting needle (Par 75 _d_), or by
regrinding. (Par 75 _e_) If this is not successful, replace both needle
and barrel as a unit.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account