Practical Methods of Sewage Disposal for Residences, Hotels and InstitutionsOgden, Henry N. (Henry Neely)
Science
Practical Methods of Sewage Disposal for Residences, Hotels and Institutions
Ogden, Henry N. (Henry Neely)
Sewage disposal
The real work of the contact filter is carried on during the period of
“resting empty,” that is, after the effluent has been withdrawn from the
bed. While the effluent fills the beds, much of the suspended solid
matter, together with a large proportion of the bacteria contained in
the sewage, adheres to a gelatinous film which has formed on the
surfaces of the stones or other materials forming the beds. This
interval of “resting full” should usually be about two hours. Then, when
the liquid portion is withdrawn from the bed, air is drawn in between
the stones, enabling the nitrifying or aërobic bacteria to do their work
of breaking down both the suspended and the partially dissolved organic
matters which have been contained in the sewage and which have adhered
to the filter material. It is believed, that some oxidation of that
portion of the organic matter which is in true solution is also
accomplished when the effluent passes over the gelatinous covering of
the stones by reason of the oxygen which has been absorbed by this
covering.
The interval when the bed is “resting empty” should be considerably
longer than the combined intervals when the bed is filling, “resting
full,” and emptying. For this reason there should be a series of from
three to five beds in order that it will not be necessary to turn the
effluent from the settling tank continuously onto one bed, which would
result in the clogging of this bed with suspended matters. The
additional third (or fifth) bed also gives opportunity for allowing each
bed in turn to be thrown out of use for intervals of a week or so at a
time, which is also necessary to keep the beds up to their proper
efficiency and obviate the necessity of cleaning or renewing the filter
material oftener than once in seven or eight years.
[Illustration:
PLAN OF SEWAGE DISPOSAL WORKS
FOR
MR. CHARLES L. A. WHITNEY
ALBANY, N.Y.
]
In Fig. 46 is shown in plan and section a sewage-disposal plant for the
residence of Mr. Charles L. A. Whitney, of Albany, N. Y., consisting of
a settling tank, dosing chamber, and contact beds. This plant is
designed to serve twenty-five persons, although the settling tanks have
a capacity for double the amount of sewage on the usual basis of design.
The depth of filtering material in the beds should preferably be four or
five feet, although, where operating head or fall is limited, this depth
may be decreased to three feet. The floor of the bed should slope toward
the outlet end at a rate of about one-eighth of an inch per foot.
Various materials are used to form the body of the filter, such as
broken stone, coke, broken brick, and furnace slag, but the material
used should not be such as will disintegrate readily, and for this
reason broken limestone, from one-half inch to one and one-half inches
in size, with perhaps two-inch stones for the bottom six inches of the
bed surrounding the underdrains, is most suitable for small plants.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account