Practical Methods of Sewage Disposal for Residences, Hotels and InstitutionsOgden, Henry N. (Henry Neely)
Science
Practical Methods of Sewage Disposal for Residences, Hotels and Institutions
Ogden, Henry N. (Henry Neely)
Sewage disposal
These underdrains should be constructed of horse-shoe tiling, and in the
case of beds more than eight or ten feet wide should preferably be laid
with short branches reaching from a main drain laid along the centre of
the floor of the bed; or these drains may be laid in parallel lines, as
shown in Fig. 46.
In order to alternate the discharge of effluent from the settling tank
onto different beds in turn and to provide for more uniformly
distributing the effluent over all portions of the bed, the
settling-tank effluent should be collected as in the other methods of
disposal described, in a siphon or dosing chamber, from which, by means
of alternating siphons, it may be delivered to the proper bed.
In the case of a group of three beds or five beds, diverting chambers
with stop-planks, similar to those described in connection with
intermittent sand filters, may be provided to allow the throwing out of
use of each of the beds in turn for a week or so at a time. In the
smaller plants accommodating up to one hundred and fifty persons, it is
hardly necessary to provide for more than three beds, thus allowing
opportunity for each one to rest for one week in every three to six
weeks, which will result in a temporary increase of fifty per cent in
the rate of application of effluent to the remaining beds. In the case
of the larger plants, especially if they are to be operated
continuously, it is better to construct five beds so that two pairs of
two beds each may be used alternately, leaving one bed, or twenty per
cent of the total area, out of use. This will result in an increase of
but twenty-five per cent in the rate of application of effluent to the
four beds in use.
With the usual rates of operation for contact beds, one filling per day
of the beds will result, and, if the dosing of the beds is carried on as
above and as described in the portion of this chapter dealing with the
dosing of intermittent sand filters, but two siphons in the dosing tank,
constituting double alternating siphons, will be necessary. Such an
arrangement will eliminate the necessity of installing plural
alternating siphons consisting of three or more siphons, the cost of
which is not warranted in connection with small plants, since the double
alternating siphons will insure proper operation of the beds at much
less cost. Of course, in the larger plants where two beds are dosed at
each discharge of a siphon, a larger siphon chamber is necessary with
the two siphons, but the extra cost of a larger siphon chamber would in
most cases be more than offset by the increased cost of plural
alternating siphons.
The main effluent carrier from the siphon chamber to each contact bed
should discharge into a half-tile carrier, with branches, laid on the
surface of the contact bed, as shown in Fig. 46.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account