A considerable amount of investigation and negotiation will have to be
entered into before the locating of the above works can be finally
decided. The desire to meet the wishes and convenience of all parties
interested must of necessity be controlled by the physical
circumstances of each case; very little alteration can be made in the
level of the rails, although some variation may be made in their
position.
When fixing the depths of culverts and drains, attention must be paid
to any probable improvement in the drainage of the district, which
might at some future time necessitate the deepening of such of the
main culverts where the inverts had been laid too high.
Unless all these details are determined, and shown on the
working-plans before the works are commenced, there is the risk that
embankments may have to be opened out to admit of bridges and
culverts, and cuttings changed to permit of road diversions.
The entire centre-line of railway must be carefully staked out by 33
driving strong wooden pegs into the ground at the end of every chain
length, and along the course of these pegs the longitudinal section
must be taken. Three pegs, one on each side of the centre peg, are
generally placed at the commencement and termination of the curves.
When the longitudinal section has been plotted to scale, and the
course of the gradients and level portions worked out and drawn on,
then the heights of the ground level and formation level can be marked
at each chain, and from them the depths of the cutting and the heights
of the embankments can be ascertained and marked at each chain. In
addition to the longitudinal section, it will be necessary to take a
large number of transverse or cross sections at those pegs, or
intermediate points, where the ground is at all side-lying or
irregular. These cross-sections are necessary to determine the
side-widths, or distances to outer edge of slopes in cuttings or
embankments, and also to calculate the actual quantity of earthwork to
be executed. For convenience in taking out the quantities, these
cross-sections are generally plotted to a natural scale, that is to
say, to the same scale horizontal as vertical, as shown in the example
of cross-sections, Figs. 15 to 24. It is also necessary to obtain
information, by boring or otherwise, as to the material of which the
cuttings are composed, whether clay, gravel, or rock.
In laying out lines through fairly level plains and populous
districts, the absence of great natural obstacles will allow the
engineer to carefully consider how far it may be prudent to diverge to
the right or to the left, to accommodate towns and places which would
be excluded by a more direct through route. There will be ample range
for selection, and it will be rather the question of policy than
compulsion which will guide him in the route to be taken.
[Illustration: Fig. 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account