No line of railway, or extension of any railway, will obtain
Parliamentary sanction unless it can be satisfactorily proved in the
outset, that its construction would be of public advantage. This point
is of paramount importance, and due weight must be given to it when
preparing to refute the evidence of opponents to the scheme.
[Illustration: Fig. 1.]
When conceding the right to make any railway, Parliament grants with 6
it the power to purchase lands or property compulsorily, or by
agreement, to change and divert roads and streams in the manner shown
on the deposited plans, and to construct all necessary bridges and
works in accordance with the standing orders, or such modifications of
them as may be approved by the Board of Trade.
The standing orders, or Government regulations, are very
comprehensive, and include much detailed information on all questions
likely to arise. The following brief summary of some of the principal
orders relating to deposited plans, and works of construction, will be
found useful for reference.
Extract from Government Standing Orders and Regulations.--All
plans and sections relative to proposed new railways must be lodged
with the constituted Government Authorities on or before November 30.
Every deposited plan must be drawn to a scale of not less than four
inches to a mile, and must describe the centre line, or situation of
the work (no alternative line being allowed), and must show all lands,
gardens, or buildings within the limits of deviation, each one being
numbered with a reference number, and where powers to make lateral
deviations are applied for, the limits of such deviation must be
marked on the plan.
Unless the whole of such plan be drawn to a scale of not less than 400
feet to an inch, an enlarged plan must be drawn to that scale of every
building and garden within the limits of deviation.
The Railway Clauses Act limits the extent of deviation to 100 yards on
each side of the centre line in the country, and 10 yards on each side
of the centre line in towns or villages.
The distances must be marked on the plan in miles and furlongs from
one of the termini.
The radius of every curve not exceeding one mile must be marked on the
plan in furlongs and chains.
In tunnels the centre line must be dotted, but no work must be shown
as tunnelling, in the making of which it is necessary to cut through,
or remove the surface soil. If it is intended to divert or alter any
public road, navigable river, canal, or railway, the course and extent
of such diversion, etc., shall be marked on the plan.
[Illustration: Fig. 2.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account