Remarks on the Proposed Railway Between Birmingham and LondonAnonymous
History
Remarks on the Proposed Railway Between Birmingham and London
Anonymous
Railroads -- Early works to 1850; Railroads -- England -- Cost effectiveness
That funds will be provided for the London and Birmingham Railway far
beyond any amount expended in canals, will be seen by the following
statement:—In 1825, it is stated, there were in England ninety-seven
canals, the total extent of which was 2,471 miles, and the cost of which
was 30,000,000_l._; giving an average cost of about 12,500_l._ per mile.
The railway from London to Birmingham will be 105 miles in length, and
capital to the amount of 3,000,000_l._ will be provided for it: this
gives an average of upwards of 28,000_l._ per mile. That the land in
this direction is more favourable to works of this kind than that in many
other parts of the country, is known by the canals that run in this
district costing less per mile than the average rate of others. But even
if the Railway costs twice or three times as much as a canal, the
advantages that it has over a canal in its amount of traffic, and the
economy attending it, are in a much greater proportion than the increase
of its cost.
There are very few canals of any extent that can pass more than two
hundred tons of goods per hour. The locks in general admit of but one
boat passing at a time, carrying from twenty to twenty-five tons. Where
the greatest despatch is used, the average is not more than eight boats
passed per hour. Here at once is a limit to the despatch of canal
conveyance. Eight boats per hour, at an average load of twenty tons,
gives only 160 tons per hour as the greatest quantity that can be passed.
The average load of a fly-boat is but sixteen tons.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account