Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.
Wentworth, Tappan
Hoosac Tunnel (Mass.); Railroad tunnels -- Massachusetts; Troy and Greenfield Railroad Company
Number of days' work.
of holes drilled.
of inches of holes drilled.
of drills dulled.
of pounds of powder used.
of feet of fuse used.
of sheets of paper used.
of pounds of soap used.
of pounds of candles used.
of quarts of oil used.
of lamps used.
of pounds of wicking used.
The captain at the shafts four times a month reports,--
The days' work of the engine-men.
The revolutions of the engine.
Number of pounds of coal used.
of feet of wood used.
of gallons of sperm oil used.
of gallons of kerosene oil used.
of pounds of tallow used.
of pounds of waste used.
of pounds of tar used.
of cages raised.
of cars of stone raised.
Size of pump-plunger used.
Length of stroke.
Number of strokes.
of gallons of water raised.
of boilers in use.
The materials furnished for the construction of the work are charged in
their distribution to twenty-three accounts, as will be seen by the
tabular statement of its cost. Requisitions for materials are signed by
the immediate overseer, captain or foreman; they are handed to the
superintendent for approval, and by him forwarded to the engineer. If
the requisition is approved by both, the materials are ordered, and when
furnished the applicant signs upon a duplicate his receipt for the same.
This course is pursued as well for materials taken from the State lands
as for those purchased. Suitable blanks for returns, requisitions, &c.,
are furnished to the several points, and the evidence of all the
transactions is preserved in the office of the engineer. In addition to
the above, a return of all material broken, or laid aside, is made to
the engineer, at whose office a substantial account of all materials on
hand, either in use, or out of use, may be found.
The organization of the working force, and the mode adopted for supplies
and expenditures at the various points, appear well adapted to an
efficient and economical prosecution of the enterprise.
DIVISIONS OF THE WORK.
_East End._
_Deerfield Dam._--This structure is completed. Flashboards to be used in
low stages of water may have to be occasionally renewed.
The canal is finished as far as wheelpit No. 3. The machine-shop is
about 72 feet long, and 36 feet wide. It has three turbine wheels. A
fourth wheel is designed, but is not required at the present time, and
the pit to receive it is not completed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account