Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.Wentworth, Tappan
History
Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866.
Wentworth, Tappan
Hoosac Tunnel (Mass.); Railroad tunnels -- Massachusetts; Troy and Greenfield Railroad Company
Sundry assessments was voted from time to, time, the last vote being in
May, 1852, amounting in all to 75 per cent. upon the subscriptions, but
they were rescinded in July, 1858, and a new series of assessments were
afterwards made which the Committee understand were as unproductive of
beneficial results as were the former, upon which only partial payments
had been made by a portion of the subscribers.
A contract for constructing the road was made with Messrs. Gilman and
Carpenter in October, 1850. At the close of the year 1850, stock to the
amount of $250,800 had been subscribed, of which $72,000 was payable in
land damages, and $50,000 was taken by the contractors.
At this period in the history of the corporation, with $138,800 of
available cash subscription, of which three per cent. had been paid, the
corporation applied to the State for aid by a loan to enable it to
prosecute the enterprise it had assumed, and this application was
continued without success until 1854, when the legislature passed the
Act authorizing a loan of $2,000,000, upon conditions which are
particularly set forth in the Loan Act, (see Appendix A and B,) which,
modified by subsequent legislation, discloses the policy of the State in
granting its assistance to the undertaking.
It is proper to state, that at the time this loan was granted, there was
no prospect of opening this line of travel by individual efforts, and
the amount of the loan, taking into consideration the then assumed
estimates of its probable cost, shows that the State assumed to defray
the cost of an enterprise to the completion of which available
individual means had proved inadequate.
In 1855, a contract for the construction of the road and tunnel was made
with E. W. Serrell. The capital stock of the corporation was fixed at
$1,500,000. This contract was changed two or three times, and finally
ended in one executed by H. Haupt and Henry Cartwright. For an account
of these changes, and of the votes and transactions of the directors and
the contractors, reference is made to Appendix A, where the same will be
found in detail.
Upon a careful examination of these votes and transactions, the
Committee come to the conclusion that the financial embarrassments of
the corporation from the year 1855, when the first contract with E. W.
Serrell was made to the time of the suspension of the works under the
last contract with H. Haupt & Co., are apparent. And it is also apparent
that during the same time, the contractors assumed, to a very great
extent, the control and responsibility of the enterprise.
Under the first contract, and on the day of its acceptance, the
direction of the engineering operations within the tunnel was left with
the contractor; excepting measuring for estimates and the final
acceptance of the work; and on his subscribing $600,000 to the capital
stock, $800,000 (less the new subscriptions,) was added to the contract
prices for the work.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account