In the case of a large stream which shifts its course, the reading
of a gauge does not give a proper indication of the water-level. In
other words, the distance of the gauge from the two ends of the reach
is subject to alteration. The case is the same as if the stream was
stable and the gauge was shifted about. In such a stream there ought,
if accuracy is required, to be a group of two or more gauges for each
point where there would be only one if the stream was not a shifting
one. Also, owing to erosion of the bank or the formation of a sandbank,
it may often be necessary to shift the gauge. When possible it should
be kept in a fixed line laid down at right angles to the general
direction of the stream. When shifted, its zero level should be altered
in such a way that the reading at the new site at the time of shifting
is the same as it was before shifting. When the gauge is moved back
to the original site its zero should be placed at its original level,
though this may give rise to a sudden jump in the reading for the
reason given in the first sentence of this paragraph.
3. =Plan and Sections.=--Making a survey and plan, and laying down on
it the lines for longitudinal and cross-sections, and taking levels
for the sections, are ordinary operations of surveying. If any land
is liable to be flooded, its boundaries should be shown on the plan
and on some of the cross-sections. Unless the water is shallow, it is
necessary to obtain the bed levels from the water-level by soundings,
the level of a peg at the water-level having been obtained by
levelling. All the sections should show the water-level as it was at
some particular time, but the water-level will probably have altered
while the survey was in progress, and allowance must be made for this.
The pegs at all the cross-sections and on both banks of the stream--for
the water-levels at opposite banks may not be exactly the same--may,
for instance, be driven down to the water-level when it is steady,
and thereafter any changes in it noted and the soundings corrected
accordingly.
In order to ascertain what changes are occurring in the channel it may
be necessary to repeat the soundings at intervals and, if there is much
erosion of the bank, to make fresh plans.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account