Bellasis, E. S. (Edward Skelton)
Canals; Hydraulic engineering; Rivers
In the case of Indian rivers which have soft channels, and are
ordinarily of moderate width but are subject to occasional floods when
the width of the stream is multiplied several times and becomes very
great, it is the rule to make the span of a railway bridge far less
than this greater width. The stream during floods scours out a deep
channel through the bridge with great rapidity, and no heading up worth
mentioning occurs. The foundations of the piers are very deep, being
frequently 50 feet below the lowest point of the river bed which can
be found anywhere within several miles of the bridge. The span of the
bridge can be arrived at by considering a general cross-section of
the river as it is when in high flood, and assuming that scour to the
depth of the lowest point, found as just explained, will take place in
one-third of the span of the bridge. The span can then be so fixed as
to give no heading up. It is not assumed that there will be no increase
in velocity through the bridge. The velocity in the deep scoured
portions will be increased. The piers are protected by loose stone
(fig. 50). The spans vary from 100 to 250 feet. The bridge over the
river Chenab at Wazirabad had originally sixty-four spans of 145 feet
each. The number of spans has since been reduced to twenty-eight. With
a very long bridge, the current of the shifting stream is more likely
to strike the bridge obliquely, though this is not the chief reason for
reducing the length. Long spans, say 250 feet, have been found to be
better than shorter spans; the cost of the stone protection round the
piers is of course less (_Government of India Technical Paper_, No.
153, “River Training and Control on the Guide Bank System,” by Sir F.
J. E. Spring, C.I.E., 1904).
2. =Syphons and Culverts.=--Syphons are used to pass drainage channels
or other streams under canals or other lines of communication. In the
case of a masonry syphon under a stream which may be dry while the
syphon is full, the weight of the arch and its solid load must be not
less than the upward pressure of the water passing through the syphon.
The channel sometimes has a vertical drop at the upstream side (fig.
51) and a slope at the downstream side. The slope enables any solid
materials to be carried through, and facilitates cleaning out and
unwatering. The drop at the upstream side does not give rise to any
shock on the floor when the syphon is full, but a slope is preferable
if there is room for it, and it causes less loss of head.
[Illustration: FIG. 51.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account