Coal 4,000
Oil and waste 500
6% interest on $581,250[B] $34,375
7% ” ” 196,000[B] 14,550 48,852
------ ------
Total expense for one year’s operation,
interest and depreciation $68,385
[B] The lower rate of interest is charged upon the house and
fixtures, the higher rate upon the plants and machinery.
Or each tenant’s rent for year to be $22.76 per month or $3.25 per
room, exclusive of charge for food but inclusive of furniture, power,
cooking, heat, light, water, vacuum sweeping, laundry and the delivery
of all food, parcels, produce, etc.
The population could without doubt be increased by 500 to 1,000 houses
more without any material increase in the principal items for labor,
such as engineers, firemen and heads of departments. The only extra
increase would be for help in these departments which would be governed
by the amount of work required.
TRANSPORTATION CALCULATIONS.
_Using Autos_
Four (4) electric autos for passengers and
food $12,000
10% interest, depreciation and repairs $1,200
Six (6) men @ $75 per month 5,400
------
$6,600
For 250 families $1.70 per month.
Mr. Sutton has not included the Boyes Monorail in his report because he
was asked to make an estimate for a single mile of Roadtown. For this
length the auto service is the more economical. Mr. Sutton, however,
finds no fault with the Monorail, as is seen from the following letter:
_Mr. Edgar Chambless,
New York City._
DEAR SIR: In reference to the adoption of the Boyes
Monorail system for Roadtown would say that I have carefully
examined the drawings and general outline of the scheme designed
by Mr. Boyes and believe it to be well adapted as a means of
rapid and noiseless transportation, and further believe that the
operating expenses of this system and the cost of construction
will be extremely reasonable. The design of the system from a
mechanical and electrical standpoint is entirely practical.
Very truly yours,
FRANK L. SUTTON.
The total cost for building and operating the Boyes monorail system
between New York and Philadelphia or for ninety miles is estimated by
Mr. Boyes as follows:
ESTIMATED COST OF BUILDING AND OPERATING ROADTOWN TRANSPORTATION.
As submitted by Wm. H. Boyes using the Boyes Monorail system.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account