One of the most important points towards obtaining a good metalled road
is to ensure a proper foundation for the metal to be consolidated on,
and to see that the sides are well confined or tied in. Where bricks are
used for this foundation they should be whole ones, not bats, be tightly
packed together and then rammed with a wooden rammer. The edging should
consist of bricks-on-end well backed up with earth on the out, or berm
side. The same applies where stone is used for the soling. These must
have flat surfaces, be of fair size, and be well hand-packed together
and rammed. It is not much use doing metalling work on a raised road
until the embankment has at least 2 rains over it to properly
consolidate it. This equally applies to the approaches to bridges on a
kutcha road where the metalled portion should be extended to a length of
at least 10 feet beyond the toe of the approach slope.
[Sidenote: Stone Metal.]
In most municipalities it is financially impossible to thoroughly repair
all the roads each year, nor is it necessary to do so, if the work has
been properly done. A system of biennial or triennial repairs should
therefore be evolved. A diagram showing how this can be arranged is
shown in Fig. 11, page 19.
In the selection of stone metal it is of great importance to see that
stone of equal grade and hardness is used, and that surface, or
weathered rock, is not mixed up with the harder material lying
underneath it in the quarries. The stone should be broken to the size
that the largest piece shall pass freely through a 1½″ diameter ring.
When repairing existing metalled roads it is essential that all old
metal be picked up, and any rounded, or traffic-worn portions re-broken,
as it is impossible to ensure good consolidation unless the edges and
corners of the stone metal be sharp. Consolidation should be done by a
heavy roller. A steam roller for preference. The cost of a 6–ton steam
roller is about Rs. 6,000 and the working cost about Rs. 4 per day, but
this must necessarily vary considerably in different localities,
depending on the cost of fuel and labour.
[Illustration:
DIAGRAM
FIG. 11.
]
_For Oiling Roads._
[Sidenote: Oiling Roads.]
The roadway must first be swept clear of dust and foreign material, when
the mixture composed of one part of coal-tar to 20 parts of oil (liquid
fuel), mixed cold, must be sprinkled on through a watering cart. Men
with hard long handled brushes follow the cart, and brush the mixture
into the roadway, and repeat this operation for the second time in the
reverse direction, when ¼ of a mile has been done. The oiling lasts for
about 2 months, and costs about Re. 1 per hundred square feet.
[Sidenote: Tar-Macadam.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account