Sanitation of Mofussil BazaarsDisney, G. W. (George William)
Science
Sanitation of Mofussil Bazaars
Disney, G. W. (George William)
Sanitation
8. The contractor must keep the work properly fenced and lighted from
sun-set to sun-rise, and place such watchmen at any portion of the road
and footpath in which the work is in progress and is still incomplete,
and also round the repairing materials for use, as may be necessary to
protect the public against accidents. He shall indemnify and keep
indemnified the Corporation and its officers and servants from all
liability in respect of any claims for damages or otherwise to person or
property which may be made by any person or persons on account of any
act, misfeasance or neglect on the part of the contractor in carrying on
the work or in connection therewith.
9. The contract will be for four months and the contractors must carry
out all works in accordance with the full programme of work prepared by
the Engineer and take in hand such street or streets as the Engineer may
direct and complete the same within such period as the Engineer may fix
therefor. In default he shall pay to the Corporation liquidated or
settled damages of Rs. 10 (ten) per diem for each and every day beyond
the said period without prejudice to the rights of the Chairman to
cancel the contract and take possession of the work and have it carried
on and completed at the contractor’s risk and cost by any agency
whatever.
10. All damages or other sums due and payable by the contractor may be
received from any moneys due to the contractor by the Corporation.
11. Payments will be made in accordance with the terms of the agreement.
12. The Commissioners do not bind themselves to accept the lowest or any
tender, but reserve the right of accepting the whole or part of the
tender.
INDEX.
A
Allahabad Shallow Trench System, 39
Appendix A, Model Rules, Privies and Urinals, 57
—— B, Removal of Town Sweepings, 61
—— C, Well Register, 62
—— D, Building Regulations, 63–67
—— E, Table Repayment of Loans, 68
—— F, Preparation of projects, 69–73
—— G, Annual Bridge Report Form, 74
—— H, Specification for Tar-Macadam, 75–77
B
Bailey’s Patent Latrines and Urinals, 26
Beds, Filter, 51
Biological System for the Disposal of Night-Soil, 50–51
Burdwan Trenching Ground, 37
Building Regulations, 63–67
Burial-Grounds, Mahommedan, 56
C
Carts, Conservancy, 33
—— Crawley’s Patent, 33
—— Hand, 34
—— Receptacle, 34
—— Register, 45
—— Refuse, 43
—— Wheels and Axles of, 44
Cesspools, 35
Collection and Disposal of Refuse, 45
Cremation of Dead Bodies, 54
—— Town Refuse, 45
Cultivation within Urban Limits, 53
D
_Débris_ of Ruined Houses, 56
Dead, Disposal of the, 54
Dhobies’ Water for Washing, 53
Disinfectants, 29
Donaldson’s Separation Latrine, 26
Drainage, Flushing, 3
—— Kutcha roadside, 2
—— Masonry, 4
—— Storm-Water, 4
Dust-Bins, 43
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account