Scientific American Supplement, No. 384, May 12, 1883 — John Shaqi
Scientific American Supplement, No. 384, May 12, 1883Various
Science
Scientific American Supplement, No. 384, May 12, 1883
Various
Science -- Periodicals
The work of connecting Liverpool with Birkenhead by means of a railway
tunnel is now an almost certain success. It is probable that the entire
cost of the tunnel works will amount to about half a million sterling.
The first step was taken about three years ago, when shafts were sunk
simultaneously on both sides of the Mersey. The engineers intrusted
with the plans were Messrs. Brunlees & Fox, and they have now as their
resident representative Mr. A.H. Irvine, C.E. The contractor for the
entire work is Mr. John Waddell, and his lieutenant in charge at both
sides of the river is Mr. James Prentice. The post of mechanical
engineer at the works is filled by Mr. George Ginty. Under these chiefs,
a small army of nearly 700 workmen are now employed night and day at
both sides of the river in carrying out the tunnel to completion. On
the Birkenhead side, the landward excavations have reached a point
immediately under Hamilton Square, where Mr. John Laird's statue is
placed, and here there will be an underground station, the last before
crossing the river, the length of which will be about 400 feet, with up
and down platforms. Riverward on the Cheshire side, the excavators have
tunneled to a point considerably beyond the line of the Woodside Stage;
while the Lancashire portion of the subterranean work now extends to
St. George's Church, at the top of Lord street, on the one side, and
Merseyward to upward of 90 feet beyond the quay wall, and nearly to the
deepest part of the river.
When completed, the total length of the tunnel will be three miles one
furlong, the distance from wall to wall at each side of the Mersey being
about three-quarters of a mile. The underground terminus will be about
Church street and Waterloo place, in the immediate neighborhood of the
Central Station, and the tunnel will proceed from thence, in an almost
direct line, under Lord street and James street; while on the south side
of the river it will be constructed from a junction at Union street
between the London and Northwestern and Great Western Railways, under
Chamberlain street, Green lane, the Gas Works, Borough road, across the
Haymarket and Hamilton street, and Hamilton square.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account