Ten horses are employed on the Birkenhead side for drawing wagons loaded
with debris to the shaft, which, on being hoisted, is tipped into the
carts and taken for deposit to various places, some of which are about
three miles distant. The tunnel is lined throughout with very solid
brickwork, some of which is, 18 inches thick (composed of two layers
of blue and two of red brick), and toward the river this brickwork is
increased to a thickness of six rings of bricks--three blue and three
red. A layer of Portland cement of considerable thickness also gives
increased stability to the brick lining and other portions of the
tunnel, and the whole of the flooring will be bricked. There are about
22 yards of brickwork in every yard forward. The work of excavation up
to the present time has been done by blasting (tonite being employed for
this purpose), and by the use of the pick and shovel. At every 45 ft.
on alternate sides niches of 18 in. depth are placed for the safety of
platelayers. The form of the tunnel is semicircular, the arch having a
13 ft. radius, the side walls a 25 ft. radius, and the base a 40 ft.
radius.
Fortunately not a single life has up to the present time been lost in
carrying out the exceedingly elaborate and gigantic work, and this
immunity from accident is largely owing to the care and skill which are
manifested by the heads of the various departments. The Mersey Tunnel
scheme may now be looked upon as an accomplished work, and there is
little doubt its value as a commercial medium will be speedily and fully
appreciated upon completion.
* * * * *
DAM ACROSS THE OTTAWA RIVER AND NEW CANAL AT CARILLON QUE
By ANDREW BELL Resident Engineer
The natural navigation of the Ottawa River from the head of the Island
of Montreal to Ottawa City--a distance of nearly a hundred miles--is
interrupted between the villages of Carillon and Grenville which are
thirteen miles apart by three rapids, known as the Carillon, Chûte à
Blondeau, and Longue Sault Rapids, which are in that order from east to
west. The Carillon Rapid is two miles long and has, or had, a fall of 10
feet the Chûte à Blondeau a quarter of a mile with a fall of 4 feet and
the Longue Sault six miles and a fall of 46 feet. Between the Carillon
and Chûte à Blondeau there is or was a slack water reach of three and a
half miles, and between the latter and the foot of the Longue Sault a
similar reach of one and a quarter miles.
Small canals limited in capacity to the smaller locks on them which were
only 109 feet long 19 feet wide, and 5 to 6 feet of water on the sills,
were built by the Imperial Government as a military work around each of
the rapids. They were begun in 1819 and completed about 1832. They were
transferred to the Canadian Government in 1856. They are built on the
north shore of the river, and each canal is about the length of the
rapid it surmounts.
[Illustration: THE GREAT DAM ACROSS THE OTTAWA RIVER, AT CARILLON.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account