Scientific American Supplement, No. 446, July 19, 1884Various
Science
Scientific American Supplement, No. 446, July 19, 1884
Various
Science -- Periodicals
The new swing bridge occupies the site of an older structure which had
been found inadequate to the requirements of the heavy and increasing
traffic, and the foundations of the old piers having fallen into an
insecure condition, the construction of a new opening bridge was taken
in hand jointly by the Corporation and Harbor Commissioners of Cork.
The new bridge, which has recently been completed, is of a somewhat
novel design, and the arrangement of the swing-span in particular
presents some original and interesting features, which appear to have
been dictated by a careful consideration of the existing local
conditions and requirements.
On each side of the river, both above and below the bridge, the quays
are ordinarily lined with vessels berthed alongside each of the quays,
and as the river is rather narrow at this point, the line of fairway for
vessels passing through the bridge is confined nearly to the center of
the river. This consideration, together with some others connected with
the proposed future deepening of the fairway, rendered it very desirable
to locate the opening span nearly in the center of the river, as shown
in the general plan of the situation, which we publish herewith. At the
same time it was necessary to avoid any encroachment upon the width of
the existing quays, which form important lines of communication for
vehicular and passenger traffic along each side of the river, and to and
from the railway stations. Again, it was necessary to preserve the full
existing width of waterway in the river itself, which is sometimes
subjected to heavy floods.
These considerations evidently precluded the construction of a central
pier and double-armed swing bridge, and on the other hand they also
precluded the construction of any solid masonry substructure for the
turntable, either upon the quay or projected into the river. To meet
these several conditions the bridge has been designed in the form of a
three-span bridge, that is to say, it is only supported by the two
abutments and two intermediate piers, each consisting of a pair of
cast-iron cylinders or columns, as shown by the dotted circles upon the
general plan.
The central opening is that which serves for the passage of vessels. The
swing bridge extends over two openings, or from the north abutment to
the southern pier, its center of revolution being situated over the
center of the northern span, and revolves upon a turntable, which is
carried upon a lower platform or frame of girders extending across the
northern span of the bridge. The southern opening is spanned by an
ordinary pair of lattice girders in line with the girders and
superstructure of the swing bridge.
We propose at an early date to publish further details of this bridge,
and the hydraulic machinery by which it is worked.
We present a perspective view of the bridge as seen from the entrance to
the exhibition building, which is situated in close proximity to the
southern end of the bridge.--_Engineering_.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account