Scientific American Supplement, No. 484, April 11, 1885Various
Science
Scientific American Supplement, No. 484, April 11, 1885
Various
Science -- Periodicals
As can be readily seen, the vital point of the whole work, and the problem
to solve, was food for men and horses. 1,700 bushels of oats every day and
15,000 pounds of provisions, Sundays and all, for an entire season, which
at the beginning of the work had to come about 170 miles by rail, and then
be taken from 50 to 150 miles by teams across a wilderness, is on the face
of it considerable of an undertaking, to say nothing about hauling the
pile-drivers, piles, and bridge-timber there. To keep from delaying the
track, sidings 1,500 feet long were graded, about 7 miles apart. A
side-track crew, together with an engine, four flats, and caboose, were
always in readiness; and as soon as a siding was reached, in five hours
the switches would be in, and the next day it would be surfaced and all in
working order, when the operating department would fill it with track
material and supplies. From the head of the siding to the end of the track
the ground was in hands of track-laying engine, never going back of the
last siding for supplies or material, and my recollection is that there
were but six hours' delay to the track from lack of material the whole
season, at any rate up to some time in November. The track-laying crew was
equal to 4 miles per day, and in the month of August 92 miles of track
were laid. The ties were cut on the line of the road about 100 miles east
of Winnipeg, so the shortest distance any ties were hauled was 270 miles;
the actual daily burden of the single track from Winnipeg west was 24 cars
steel, 24 cars ties, aside from the transportation of grain and
provisions, bridge material, and lumber for station houses. The station
buildings were kept right up by the company itself, and a depot built with
rooms for the agent every 15 miles, or at every second siding. The
importance of keeping the buildings up with the track was impressed on the
mind of the superintendent of this branch, and, as a satire, he
telegraphed asking permission to haul his stuff ahead of the track by
teams, he being on the track-layers' heels with his stations and tanks the
whole season. The telegraph line was also built, and kept right up to the
end of the track, three or four miles being the furthest they were at any
time behind.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account