The sinking of mine shafts in certain Belgian and French basins, where
the coal deposit is covered with thick strata of watery earth, has
from all times been considered as the most troublesome and delicate,
and often the most difficult operation, of the miner's art. Of the few
modern processes that have been employed for this purpose, that of
Messrs. Kind and Chaudron has been found most satisfactory, although
it leaves much to be desired where it is a question of traversing
moving sand. An interesting modification of this well-known process
has recently been described by Mr. E. Chavatte, in the Bulletin de la
Societe Industrielle du Nord de la France. Two years ago the author
had to sink a working shaft at Quievrechain, 111 feet of which was to
traverse a mass of moving and flowing sand, inconsistent earth,
gravel, and marls, and proceeded as follows:
He first put down two beams, A B (Pl. 1, Figs. 2, 3, and 9), each 82
feet in length and of 20x20 inch section in the center, and upon these
placed two others, E F, of 16x16 inch section. Beneath the two first
were inserted six joists, _c c c c c c_, about 82 feet in length and
of 14 or 16 inch section in the center. Finally these were
strengthened at their extremities with two others, _d d_, about 82
feet in length. All these timbers, having been connected by tie bands
and bolts, constituted a rigid structure that covered a surface of
nearly seven hundred square yards.
From the beams, A B and E F, there was suspended a red fir frame by
means of thirty-four iron rods.
Upon this frame, which was entirely immersed in the moving sand, there
was established brick masonry (Figs. 1, 2, and 3). As the ends of the
timbers entered the latter, and were connected by 11/2 inch bolts, they
concurred in making the entire affair perfectly solid. The frame, K K,
was provided with an oaken ring, which was affixed to it with bolts.
After this, a cast iron tubbing, having a cutting edge, and being
composed of rings 3.28 feet wide and made of six segments, was
lowered. This tubbing was perfectly tight, all the surfaces of the
joints having been made even and provided with strips of lead
one-tenth of an inch thick. It weighed 4,000 pounds to the running
foot.
[Illustration: FIG. 1.--Section through A B. FIG. 2.--Plan. FIG.
3.--Section through C D. FIG. 5.--Section through E F of Fig. 4. FIGS.
6 AND 7.--Work Prepared and finished. FIG. 10.--Section through A B
and C D of Fig. 12. FIGS. 11 6 AND 12.--Arrangement of jack-screw.
FIG. 13.--Section through A B and C D of Fig. 11.
PLATE I.--SINKING A MINE SHAFT.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account