In the first place, temporary ties, or gauges, connecting the slabs
forming the two faces of the wall, have been used, and as soon as the
plastic filling-in material has set or become hard (but not before),
these have been removed. Secondly, permanent ties or cramps have been
used, and, as their name implies, have been allowed to remain in the
wall and to be entirely buried in the plastic filling-in material. These
permanent transverse ties or cramps have been of two kinds: those which
were affixed as soon as the slabs were placed in position, and those
which were made to form part of the manufactured slab, as, for instance,
slabs of Z or H horizontal section. Thirdly, a small layer of the
plastic filling-in material itself has been made to act as a transverse
tie by depositing it, when plastic, between the slabs forming the two
parallel faces of each course, allowing it (before filling in the
remaining part) to set and to thus connect together the slabs forming
each face of the wall, a suitable hold on the slabs, in some cases,
being given to the tie by a portion of the slab being undercut in some
way, as by being dovetailed, etc. As the slabs in this latter system
generally have wide bases, they may also be bedded or jointed in cement,
and, provided temporary ties be placed across their upper edges to
connect the slabs forming each face of the wall together, the space
between the faces of the wall may then be filled in with the plastic
concrete.
All these devices, however, are not of permanent utility; they are only
temporarily required (i.e., up to the time that the beton has become
hard and formed a permanent traverse tie between the two faces of the
wall), for it is manifest that the ultimate object of all slab concrete
construction is: (a) To retain and to mould the plastic concrete used in
forming the wall; (b) to key or fix the slabs to the mass which they
themselves have moulded; and (c) to form a facing to the wall. When
these objects shall have been accomplished, there is no further need of
any tie whatever beyond that which naturally obtains in a concrete wall.
In West's system, however, where the slabs are keyed course to course,
any kind of transverse tie to be used during the process of
construction, except that used in the starting course, is entirely
dispensed with, and the courses of slabs above depend solely upon the
courses of slabs below them for their stability and rigidity up to the
time that the plastic filling-in has been deposited and become hard
between both faces of the wall.
[Illustration: CONCRETE CONSTRUCTION]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account