Scientific American Supplement, No. 810, July 11, 1891Various
Science
Scientific American Supplement, No. 810, July 11, 1891
Various
Science -- Periodicals
The new canal starts at Holtenau, on the north side of the Kiel Bay,
and joins the Elbe fifteen miles above the mouth. From Kiel Bay to
Rendsborg, at the junction with the Eider, the new canal follows the
Schleswig and Holstein Canal, which was made about one hundred years
ago, and is adapted for boats drawing about eight feet; thence it
follows the course of the Eider to near Willenbergen, when it leaves
that river and turns southward to join the Elbe at Brunsbuttel, about
forty miles below Hamburg. The canal is 61 miles long, 200 ft. wide at
the surface, and 85 ft. at the bottom, the depth of water being 28 ft.
The surface of the water in the two seas being level, no locks are
required; sluices or floodgates only being provided where it enters
the Eider and at its termination. The country being generally level
there are no engineering difficulties to contend with, except a boggy
portion near the Elbe; the ground to be removed is chiefly sandy loam.
Four railways cross the canal and two main roads, and these will be
carried across on swing bridges. The cost is estimated at L8,000,000.
About six thousand men are employed on the works, principally Italians
and Swiss.--_The Engineer._
* * * * *
THE KIOTO-FU CANAL, IN JAPAN.
Japan is already traversed by a system of railways, and its population
is entering more and more into the footsteps of western civilization.
This movement, a consequence of the revolution of 1868, is extending
to the public works of every kind, for while the first railway lines
were being continued, there was in the course of excavation (among
other canals) a navigable canal designed to connect Lake Biwa and the
Bay of Osaka, upon which is situated Kioto, the ancient capital of
Japan.
The work, which was begun in 1885, was finished last year, and one of
our readers has been kind enough to send us, along with some
photographs which we herewith reproduce, a description written by Mr.
S. Tanabe, engineer in chief of the work.
The object of the Kioto-Fu Canal is not only to provide a navigable
watercourse, putting the interior of the country in connection with
the sea, but also to furnish waterfalls for supplying the water works
of the city of Kioto with the water necessary for the irrigation of
the rice plantations, and that employed for city distribution. It
starts from the southwest extremity of Lake Biwa, the largest lake in
Japan, and the area of which is 800 square kilometers. This lake,
which is situated at 84 meters above the level of the sea, is 56
kilometers from the Bay of Osaka. As this bay is already in
communication with Kioto by a canal, the Kioto-Fu forms a junction
with the latter after a stretch of 11 kilometers and a difference of
level of 45 meters between its extremities.
[Illustration: FIG. 1.--EXTREMITY OF LAKE BIWA AND BEGINNING OF THE
CANAL.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account