The first thing to do is to get the cable drawn into the ducts, and on
the proper accomplishment of this depends to a great extent the success
or failure of the whole installation. Probably the ducts have been wired
when the subway was constructed, but if not a wire must be run through
as a means of pulling in the draw rope. There are several kinds of
apparatus for getting a wire through a duct--rods, flexible tapes,
mechanical "creepers," etc.; but probably the best is the sectional rod.
This simply consists of three or four foot lengths of hard wood rods,
having metal tips that screw into each other. A rod is placed in a duct
at a manhole, one screwed to that, both are pushed forward, another one
added and pushed forward, and so on until they extend the entire length
of the duct. Then the wire is attached and the rods are pulled out and
detached one at a time and with the last rod the wire is through. At
least No. 14 galvanized iron or steel wire should be used, for any
smaller size cannot be used a second time, as a rule. In starting to
pull in the draw rope a wire brush should be attached to the wire and to
this again the rope, and when the brush arrives at the distant end of
the duct it very likely will bring with it a miscellaneous collection of
material which for the good of the cable had better be in the manhole
than in the duct.
The reel or drum carrying the cable should be mounted on wheels or jacks
and placed on the same side of the manhole as the duct into which the
cable is to be drawn, and must always be so placed that the cable will
run off the top of the reel.
There are several methods of attaching the draw rope to the cable. As
simple and strong a method as any is to punch two of these holes through
the cable, lead and all, and attach the rope by means of an iron
wire--some of the draw wire will do--run through these holes. Depending
on the length and weight of cable to be pulled it can be drawn either by
hand or by a multiplying winch. The rope should run through a block
fastened in the manhole in such a position that the rope shall have a
good straightaway lead from the mouth of the duct.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account