Sewage and Garbage Disposal on the FarmRockey, J. W. (John Wesley)
Science
Sewage and Garbage Disposal on the Farm
Rockey, J. W. (John Wesley)
Sanitation, Rural; Sewage disposal, Rural
Masonry units should be laid in full beds of 1:3 cement mortar and
the walls and floor plastered with at least a 1/2-inch coat of 1:2
mortar. Cells of concrete blocks and tile must be filled with concrete.
Masonry walls are generally 8 inches thick, and care must be taken to
follow _inside_ dimensions given for concrete tanks. Directions for
laying structural tile, brick, and concrete blocks can be obtained from
dealers or trade associations.
Commercial tanks are suitable if they embody the essential features
given in this bulletin. Capacities should be as recommended in figure
4 for concrete tanks. Proper installation and periodic servicing also
are essential. Tanks badly damaged in handling should not be used.
Rapid corrosion of steel tanks will result if the asphalt coating is
impaired. Minor defects in precast masonry tanks may often be overcome
by plastering the interior with cement mortar.
BUILDING A CONCRETE TANK[5]
[5] For information on making and placing concrete, see Farmers'
Bulletin 1772, Use of Concrete on the Farm.
A convenient method of assuring correct location of the tank is to
build a frame as shown in figure 6. Care is necessary to aline it with
the center line of the inlet and outlet and to level it so that the
distance from the bottom of the 2 by 4's on the form to the lower edge
of the inlet hole in the form will permit it to be set at the grade of
the house sewer. This frame is used to support the form for the tank.
To avoid caving the edges, drive the stakes supporting the frame before
beginning the excavation. The lumber in the frame can be used later to
make part of the tank baffles.
[Illustration: Figure 6.--Method of outlining a septic-tank excavation
on the ground surface.]
Figure 7 shows how an inside form can be built and hung in place. The
inlet and outlet tees should be carefully set and tied in place before
the concrete is poured. A single length of pipe should be joined to
the tee, so that the two can be set in the form as one unit. In most
cases the earth walls of the excavations will serve as the outside
forms unless the soil is sandy or gravelly and the excavation is deeper
than 5 feet. If outside forms are used, space must also be provided for
them. Forms should be constructed before the excavation is made and the
tank built as soon as practical, to avoid warping of forms and caving
of earth walls.
[Illustration: Figure 7.--Inside form hung in place for single-chamber
septic tank, also a form for casting concrete-slab cover in sections.]
County agricultural agents, local health departments, building-material
dealers, and other agencies often have forms that may be borrowed or
rented.
THE EFFLUENT SEWER
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account